Orange County NC Website
PRA_IF(`T TITI F <br />PENDING 10 YEAR CAPITAL INVESTMENT PLAN <br />zotat t Lottery ealenes/ Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 TEN YEAR <br />a„d..w.a ~..x..oiocnw 90t t-b 7n19_13 707A-1d 9nid-1A 9nfFi-iR 7n1(i•17 ?n17-1R 7ntA-1A 9M n..10 9n90-21 TO7A1. <br /> <br />FlrslSafety/Securl Systems <br />All Schools: ex analon/u reds of s stems g 5`36a 39,637 125,000 75,000 239,637 <br />Lincoln Center.Flre SystemrGym Access Controls 20,000 <br />Estee Hl~s: expand access controls 20,000 <br />FPG: intercom 30,000 30,000 <br />Phlilips: Access Controls ~5"ooa <br />CHHS: Security CamererC and D Buildings 45,000 35,000 35,000 <br />ECHHS: Security CamerasAMercom ex ansion 40,000 25,000 <br /> <br />Indoor Alr Quality im rovements <br />Dlatricl IAQ Projects 50,000 100,000 150,000 <br />Classroom Car t Removal: McDougle 125,t)DO - <br />Classroom Car ei Removal: FPG/Seawall 95,000 <br />ECHHS: carpet removal 25.000 <br /> <br />Mechanical S stems <br />Carrboro Elm: 1978 Electric BoilerlCooling Tower 100,000 100,0(70 <br />Ephesus: 1991 Addition-HVAC Im rovements 100,000 100,000 <br />E hesus:1990BoilerRe IacemeM 71,177 71,177 <br />Estee Hilts: Multi P se Build chiller 25,000 <br />Estes Hills: Lower Level Classroom humidity 100,000 <br />Estee Hills: 1978 Electra Boiler Replacement 60,000 60,000 <br />Estes Hills: Multi Purpose 1978 Building Boller 60,000 60,000 <br />Glenwood: Re lace 4 Basement Heat Pu 40,000 <br />Glenwood: Multi Pur ose 1978 Building Boiler 60,000 60,000 <br />FPG: Primary Building Boiler Re lecernent 60,000 60,000 <br />FPG: U reds Handica LI[is 150,000 150,000 <br />Mc le Ctxn lax: Cools Tower Re lacement 75,000 75,000 <br />McDougle Complex: DI stet HVAC Controls 125,000 125,000 <br />Scroggs: Back-u Chiller 310,000 <br />Scroggs: Cooling Tower 75,000 75,000 <br />Seawall: Lawlor Building Boller 63,920 43,722 107,642 <br />Culbrelh: Digital HVAC Controls 150,000 150,000 <br />Philll s: Ex and Digital HVAC Controls 75,000 75,000 <br />CHHS: Re lace 4 Fan Coil Unfts G mnasium 100,000 <br />CHHS: CID Buildings Re lace Electric Heat 425,000 425,000 <br />ECHHS: 1990 Cooling Tower 85,000 85,000 <br />Lincoln Center: chiller re iacernent 65,000 <br /> <br />Mobile ClassroomslRental S ace 100,000 103,000 106,000 110,000 113,000 116,000 120,000 123,000 126,000 128,000 1,145,000 <br /> <br />Paving:Parking LotslDrivewayslWalkwaya <br />CHHS: North Perkklg Lot and Driveway 160,000 150,000 150,000 <br />Philll s: Stall Parking LoUBus Area 45,363 <br />Estes Hills: Front Parkin LoUDriveway 75,000 75,000 <br />Seaweli: Staff Driveway and Parking lot 135,000 <br /> <br /> <br /> <br /> <br />