Orange County NC Website
on the master plan. as per the Committee's charge. It is our <br />understanding the exact location of these future activities wfll <br />be addressed at a subsequent time. <br />Master Plan Rationale <br />As the master plan design unfolded, the Commidw became aware that the <br />majority of the proposed.acirvity would need to be located.in two `pods' of the <br />park This was made apparent by the uncertainty surrouncling use of the former <br />ianditlled areas • and the existing plans for the County and municipal future uses <br />on the eastern part (eastern pod) of the site. Therefore, the fatuities were <br />designed to avoid these areas, work around the existing stream buffer, and try to <br />protect as much of the mature hardwood forest in the southem part of the site as <br />possible. <br />However, the remaining best usable land was largely located in the 'southern <br />pod' near the hardwoods area. The master plan sites most of the facilities of the <br />park in this area, while preserving a block of the hardwoods. The design attempts <br />to keep as much of this area Mad as posslbK and sites only a picnic shelter <br />and playground (which can be nestled among the trees). The larger facilities are <br />located to the north and west of the best part of the hardwoods. Specimen trees <br />of large caliper or age were also protected. The retention of this forested area will <br />also serve as a troffer for residents along Torain Street. The Town of <br />Hillsborough plans to construct a 10.000 to 12,000 square foot Public <br />Works/Motor Pool faciliity on its designated site (generally the southwest comer <br />of the County Public Works property, which•would be transferred to the Town). <br />Also to be Included on the site is 7,000 to S,00O square feet of covered storage <br />facilities-NOTE: Based on subsequent discussions. by the Town and County, the <br />t own will reduce the size of the land parcel it receives as part of a land swap <br />with Orange County by agreeing not to build in the "hardwood' sectiorf. As such <br />fie Master Plan map should reflect the area west of the existing fuel pumps as <br />"Zeserved for Future Use` to be negotiated between Orange County and the <br />Town of Hillsborough at the point when one of the parties has a potential use that <br />property could accommodate Please see Appendix 4 for additional details- <br />The second pod of activtty ts- smaller and would be located near the existing <br />Hillsborough Community Policing Station. The group recognized that there is an <br />arbor and history of using this area, termed the 'western pod'. as a gathering <br />spot, and while the available or usable land is limited, some facilities would be <br />retained here. These facilities are also easily accessed from Rainey Avenue. <br />To facilitate greater accessibility between the two pods of park activity, a <br />connector trail is proposed that offers a direct way of moving from the ' westem <br />pod' (police station/picnic/playground area) to the `southern pod' (ballfield and <br />other fac lutes). This 1000 -foot trail also allows persons entering the park from <br />pe <br />70 <br />14 <br />i Ddeto& TN Town plans to beak <br />E ftrs0 onfti ip, k or <br />to dts w ft to Intent b bava <br />1 <br />an awagw b►palsmel tuuae <br />