Browse
Search
Agenda - 02-24-2011 - 4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 02-24-2011
>
Agenda - 02-24-2011 - 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 10:32:21 AM
Creation date
2/18/2011 4:21:16 PM
Metadata
Fields
Template:
BOCC
Date
2/24/2011
Meeting Type
Municipalities
Document Type
Agenda
Agenda Item
4
Document Relationships
Minutes 02-24-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
76 <br />e X C-0-re 4- -%-o , R.,r 4-4-e Q 4 •u <br />Recommendations of the Committee <br />Note: In reviewing the master plan and the following recommendations, it may be useful <br />to think of the master plan for the site as having three sections, or pods.' The southern <br />pod' includes the majonly of proposed park facilities and would be accessed from Torain <br />Street or the connector tral (see below) - or for persons outside of the neighborhood, <br />from the NC 571 NC 86 intersection. The "wastem pod' is kbcated adjacent to the existing <br />community porting station and is adjacent to Rainey Avenue. The eastern pod' <br />contains the County Public Works site and future Town Pubrc Works site, a" with <br />other planned future County facififies. The reason for the 'pod' design approach is <br />explained in the rationale section on page 6. <br />After considering all of the above information and discussing the <br />possibilities, the Committee recommends the foll owing actions as <br />facility improvements for Phase 2 of the park: <br />1. That the following facilities be constructed as Phase 2 of the <br />Fairview Park as the top priorities (as shown on the attached <br />Master Plan map on page 4). These facilities are listed in <br />priority order, with the understanding that some facilities may <br />need to be deferred based on available funds: <br />• Two hard- surface lighted basketball courts, located the <br />"southern pod." <br />• A full-size ,youth baseball/softball field, located in the <br />southern part of the site. <br />• Two new Rlaygrounds, one near the new ballfield in the <br />"southern pod," and a replacement playground in the <br />"western pod" near the existing structure and police <br />station. <br />• A picnic shelter with concessions bay (and possible <br />restroomsI located near the new ballfield in the <br />"southern pod" <br />• Walking trails of approximately % mile in total, with a <br />main trail connection between the ballfield ( "southern <br />pod"). and the police station / playground ( "western <br />pod "). There would also be a trail around the new <br />ballfield, with spur to the southern parking lot and Torain <br />
The URL can be used to link to this page
Your browser does not support the video tag.