Orange County NC Website
2. Analysis Methodology <br />- Using TRM model with the modified year 2035 SE data, the predefined scenarios were analyzed. <br />- Since the purpose of this analysis is to assess congestion relief on Churton Street or maintaining <br />an acceptable congestion level on the street, the following five Measures Of Effectiveness on <br />year 2035 PM peak period are selected: <br />o Projected volume on Churton Street, <br />o Travel time on Churton Street, <br />o Average V/C on Churton Street, and <br />30 <br />