Browse
Search
2011-039 AMS - H. M. Kern Corp for Health Department Renovations at Whitted Building $763,800
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-039 AMS - H. M. Kern Corp for Health Department Renovations at Whitted Building $763,800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 2:45:22 PM
Creation date
2/16/2011 3:50:37 PM
Metadata
Fields
Template:
Contract
Date
2/16/2011
Contract Starting Date
2/16/2011
Contract Ending Date
7/26/2011
Contract Document Type
Agreement - Construction
Agenda Item
2/15/11; 4-m
Amount
$763,800.00
Document Relationships
Agenda - 02-15-2011 - 4m
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 02-15-2011
R 2011-039 AMS - HM Kern health department renovations
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ PIEDMONT FIRE <br />PROTECTION SYSTEMS <br />3609 Bastion Lane, Raleigh, NC 27604 <br />919-212-2356 office • 919.212.2357 fax <br />E-mail: tvoncannonna~.oiedmontfire.com <br />North Carolina License 22451 FS Class 1 <br />General ClarificationslQualifications: <br />- The office area and the mechanical areas are to be protected by the wet system provided and installed. <br />- Valve and/or access panels, are provided in our pricing. The access panels will installed and painted by <br />others at no cost to Piedmont. <br />-A Dry system is included for the attic space. <br />Exclusions: <br />• Bonds, <br />• Pre-action system. <br />• Galvanized piping. <br />• Ceiling removal, ceiling replacement <br />• Access Panels for our work, are to be installed and painted'by others <br />• i=lectrical power wiring <br />• Building Fire alarm interface. <br />• Gaseous System <br />• Painting andlor patching, <br />• Painting of piping concealed or exposed <br />• Fire alarm, wiring, or interface. <br />• Soffits to conceal piping, <br />• Cutting of ceiling the for sprinkler heads, <br />• Interstitial ceiling protection, <br />• Our drawings will be sealed by our on staff NICET III, <br />- Wet System design, materials piping and labor to install the overhead wet system at the roof level will be <br />provided in all interior heated areas not covered by the dry system. <br />- Dry System design, materials piping and labor to install the overhead dry system will be provided in all <br />unheated areas not covered by the wet system. <br />Worlc as described above <br /> <br />Perfornnance Under Pressure Turning Heads Since 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.