Browse
Search
2011-039 AMS - H. M. Kern Corp for Health Department Renovations at Whitted Building $763,800
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-039 AMS - H. M. Kern Corp for Health Department Renovations at Whitted Building $763,800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 2:45:22 PM
Creation date
2/16/2011 3:50:37 PM
Metadata
Fields
Template:
Contract
Date
2/16/2011
Contract Starting Date
2/16/2011
Contract Ending Date
7/26/2011
Contract Document Type
Agreement - Construction
Agenda Item
2/15/11; 4-m
Amount
$763,800.00
Document Relationships
Agenda - 02-15-2011 - 4m
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2011\Agenda - 02-15-2011
R 2011-039 AMS - HM Kern health department renovations
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ PIEDMONT FIRE <br />PROTEtCftON SYSTEMS <br />3604 Bastion Lane, Raleigh, NC 276(?4 <br />919-212-2356 office • 919.212.2357 fa~c <br />E-mail: tvoncannonC~3aiedmontfire.com <br />North Carolina License 22451 FS Class I <br />Specification Sections; 1 Fire Protection <br />Piedmont will provide all; fabricated materials and labor to install water based fire protection system to protect this <br />facility as per the referenced drawing. A!I pricing is based on the facility as shown on the referenced drawings. We <br />have assumed the water will be delivered at a rate and pressure sufficient to support our sprinkler design for this <br />system. All sprinkler piping to be installed and inspected prior to the ceiling file and sheet rock being installed. <br />Our Pricing includes the wet system far all areas except where dry systems are utilized. No pre-action system will <br />be supplied. <br />Protection above the ceilings is not required or noted because the walls are non-combustible or the combustible <br />construction is covered and rated by sheet rock. The remaining areas above the drop ceiling will not require <br />protection because there is no combustibles in this area. <br />Materials 1 Above Ground: <br />This work wil! entail the fabricated materials, devices, piping and hanger assemblies as needed to protect the facility <br />as shown on the above referenced drawings. All piping utilized on the `Wet Firs Protec#ion Sys#em" will be black <br />steel piping utilizing black cast iron fittings on all piping 2" and below. All piping 2 % and above will be black steel and <br />utilize grooved painted fittings. All piping and devices will be UL 1 FM listed for the use on Fire Protection Systems. <br />Our piping will be supported and restrained as per NFPA 13. All test and inspections will need to be coordinated to <br />insure we are complete when agreed. All information we have, was gleaned from fhe drawings noted above. Our <br />work to be roughed in and inspected prior to ceilings tiles or soffits being installed. This work will inGude the <br />installation of sprinkler piping, devices and sprinkler heads as needed to pro#ecf the renovated area, as shown on <br />the above referenced drawings. <br />Materials 1 Above Ground: <br />This work will entail the fabricated materials, devices, piping and hanger assemblies as needed to protect the facility <br />as shown on the above referenced drawings. All piping utilized on the 'Dry Fire Protection Systems" will be black <br />steel piping utilizing black cast iron fittings on all piping 2" and below. All piping 2 % and above will be black steel and <br />utilize grooved painted fittings. All piping and devices will be UL 1 FM fisted for the use on Fire Protection Systems. <br />Our piping will be supported as per NFPA 73. All test and inspections will need to be coordinated to insure we are <br />complete when agreed. All information we have, was gleaned from the drawings noted above. Our work to be <br />roughed in and inspected prior to ceilings tiles or soffits being installed. This work will include the installation of <br />sprinkler piping, devices and sprinkler heads as needed to protect the building, as shown on the above referenced <br />drawings. <br />Underground Pipinq: NIA <br />Addenda: N/A <br />Performance Under Pressure Turning Heads Since 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.