Browse
Search
2011-023 AMS - Energie Innovations, Inc. - Construction Agreement Under $250,000 for Sportsplex Low E Ceiling
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2011
>
2011-023 AMS - Energie Innovations, Inc. - Construction Agreement Under $250,000 for Sportsplex Low E Ceiling
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2018 2:31:14 PM
Creation date
2/14/2011 11:59:03 AM
Metadata
Fields
Template:
Contract
Date
2/4/2011
Contract Starting Date
2/4/2011
Contract Ending Date
4/30/2011
Contract Document Type
Agreement - Construction
Amount
$49,780.00
Document Relationships
R 2011-023 AMS - Energie Innovation low emmisive ceiling installation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y ~ <br />~ ~ <br />® Please return this Copy to the ~'~ _ <br />Clerk to the Board's office for PAF <br />[Departmental Use Only] <br />TITLE Sportsplex Low E Ceiling <br />FY 2010-11 <br />NORTH CAROLINA <br />CONSTRUCTION AGREEMENT UNDER $250,000.00 <br />ORANGE COUNTY <br />THIS ONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the ~~Tia <br />day of ~E~~~~20 E I , by and between Energie Innovation, Inc. , (hereinafter called the "Contractor"), and. <br />Orange County, a body corporate and politic and a political subdivision of the State of North Carolina, <br />(hereinafter called the "Owner"). <br />WITNESSETH: <br />That the Contractor and the Owner, for the consideration herein named, agree as follows: <br />1. SCOPE OF WORK <br />The Contractor shall furnish and deliver all of the materials, and perform all of the work <br />required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br />executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are attached hereto and made a part hereof as if fully contained herein and prioritized as follows: <br />a. Construction Drawings prepared by N/A (Sheet N/A dated N/A) <br />b. Written specifications prepared by the project engineer. <br />c. Orange County's request #367-1600 ("Attachment A", pages A-1 through A-17) for <br />competitive proposal dated November 9, 2010 which fully describes the work to be performed, <br />such work hereinafter called the "Work". <br />d. Other documents as follows: Contractor Response submitted on 11/22/2010, including <br />executed Addendum 1 and Addendum 2 ("Attachment B, pages B-1 through B-6). <br />2. TERM AND SCHEDULING <br />a. The Contractor agrees to commence work on the date of the executed original of this <br />Agreement and agrees to complete fully all Work included by Apri130, 2011. <br />b. Time is of the essence with respect to all dates specified in the Contract Documents as <br />Completion Dates. <br />c. The Contractor shall perform the Work in the time, manner and form required by the <br />Contract Documents and as stipulated in a written Notice-to-Proceed to be executed by the <br />Contractor and Owner. <br />d. It is expressly understood that the Owner will employ other contractors to perform work as <br />a part of the Project whose work will be performed simultaneously and sequentially with <br />the performance of the Work by the Contractor. It shall be necessary for the Contractor to <br />coordinate its activities with such other contractors, particularly with respect to access to <br />work areas, storage of materials and other common facilities. <br />Revised July 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.