Browse
Search
Agenda - 02-15-2011 - Information Item 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 02-15-2011
>
Agenda - 02-15-2011 - Information Item 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2011 10:29:27 AM
Creation date
2/14/2011 10:29:25 AM
Metadata
Fields
Template:
BOCC
Date
2/15/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
Information Item #3
Document Relationships
Minutes 02-15-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 2, 2011 <br />Page 2 <br />All of the above actions have been preparing the economic development growth corridor <br />for change. In anticipation of this and acknowledging that these actions have been over <br />an extended period, staff will be pursuing public outreach to affected areas. Some <br />areas have: <br />ED land use and zoning, <br />Commercial-Industrial land use and residential zoning (R-1), and <br />Agricultural-Residential land use and zoning. <br />These areas have been proposed for a land use and zoning change to prepare for <br />primarily non-residential economic development with a minor mixed use component. <br />This public outreach will discuss, inform and seek input on land use changes, existing <br />conditions and in-progress engineering utility design work where access and easements <br />will be necessary. <br />Staff is scheduling a public outreach meeting on March 7, 2011 at Gravelly Hill Middle <br />School at 7:00 pm to discuss the variety of topics aforementioned and update affected <br />property owners on the master plan for the area. The County is preparing a questions <br />and answers brochure that will explain a variety of common questions regarding land <br />use, economic development and engineering. We will also be noting public water and <br />service utility design options that could promote cost/service benefit efficiency. We will <br />report on these options at an upcoming engineering design contract update. <br />For questions, please call or email Craig Benedict, Planning Director, 919-245-2585, <br />cbenedict(a~co.orange.nc.us or Tom Altieri, Planner III, 919-245-2579, <br />talteriCa)_co.orange.nc.us. <br />
The URL can be used to link to this page
Your browser does not support the video tag.