Browse
Search
Agenda - 02-15-2011 - Information Item 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2011
>
Agenda - 02-15-2011
>
Agenda - 02-15-2011 - Information Item 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2011 10:29:27 AM
Creation date
2/14/2011 10:29:25 AM
Metadata
Fields
Template:
BOCC
Date
2/15/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
Information Item #3
Document Relationships
Minutes 02-15-2011
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT <br />Craig N. Benedict, AICP, Director <br />Administration ~°'"`~ ~°`°. <br />131 W. Margaret Lane <br />(919) 245-2575 ` . ; Suite 201 <br />(919) 644-3002 (FAX) ~1 ~ ~ '~ P. O. Box 8181 <br />www.co.orange.nc.us '~'r~ y "~ Hillsborough, NC 27278 <br />4 iLai°~~ <br /> <br />MEMORANDUM <br />TO: Board of County Commissioners <br />Frank W. Clifton, Jr., County Manager <br />FROM: Craig N. Benedict, AICP, Planning 8~ Inspections Director <br />DATE: February 2, 2011 <br />SUBJECT: Buckhorn-Mebane Utilities Phase II/Land Use: Community Outreach <br />ATTACHMENT: Current Future Land Use Map Areas A, B, C, T, only Mebane ETJ <br />(M ETJ) <br />Background: Orange County has been evaluating the land use growth potential of the <br />I-85/I-40 interstate corridor since the early 90's. In 1994 Orange County rezoned over <br />1000 acres from Rural Residential (R-1) to Economic Development (ED) with <br />specialized design standards (i.e. Design Manual). Further, its review of these areas in <br />the Efland-Buckhorn-Mebane Corridor through small area planning efforts have <br />culminated in recommendations and implementation actions between 2005 and 2010. <br />Specifically: <br />• Watershed Boundary amendments near Seven Mile Creek <br />• Water and Sewer Management Planning & Boundary Agreement (WASMPBA) <br />amendments near Hillsborough and. Mebane <br />• Infrastructure Master Planning in the Buckhorn Economic Development Zones - <br />January 2010 <br />• Funding for Utility Infrastructure Design in Buckhorn-Mebane Economic <br />Development areas in 2010-2011 budget <br />• Ongoing collaboration with the City of Mebane <br />Departments involved: <br />• Planning & Inspections <br />• Manager's Office <br />• Economic Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.