Orange County NC Website
<br />Attachment B: Comparative Costs <br /> Schematic <br /> Estimate (12/14/10) <br />Base Bid 885,035 <br />Structural Alternates 80,000 <br />Code Improvements, <br />assuming no sprinkler 40,000 <br />Base building adjustments due <br />to sprinkler installation 0 <br />2nd Flr Board, Classroom <br />Renovation Alternate 0 <br />Sub-Total 1,005,035 <br />Responsive Low Bidder, Responsive Low Bidder, <br />Assuming Sprinkler Assuming No Sprinkler <br />(1/19/111, H.M. Kern) (1/19/11, J, Wayne Poole) <br />673,000 707,700 <br />53,300 40,468 <br />not required <br />-1,500 <br />39,000 <br />12,668 <br />not required <br />19,598 <br />780,43 <br />