Orange Co. Health Department Renovations
<br />Bid Tabulation, 1/19/11, page 2 of 2
<br />CONTRACTOR Alt. #1-Struct. Alt. #2 -Code Alt. #3 -Struct. Alt. #4 -Work Alt. #5 -
<br /> Reinf. of 2"d FI.
<br />Bldg. A Improvements of
<br />2"~ Fl. Bldg. A Reinf. of lg` FI.
<br />Bldg. A Assoc. with
<br />Separate Renovate East
<br />Wing of 2"d Fl.
<br /> Contract for
<br /> Automatic Fire
<br /> Suppression Sys.
<br /> Bld . A
<br />AIM .Construction No bid
<br />Contracting
<br />Bar Construction $44,900 $30,000 $35,000 $5,750 $9,500
<br />Bordeaux $33,969 $29,040 $32,073 $2,500 $30,702
<br />Construction Co.
<br />Colmar No bid
<br />Contracting
<br />Harrod & Assoc $39,000 $27,000 $62,000 N/C $32,000
<br />Constructors
<br />Inland Const. Co. $27,654 $21,669 $30,078 $(3,500) $22,158
<br />H. M. Kern Corp. $26,000 $27,000 $27,300 $(1,500) $39,000
<br />Lomax $37,000 $30,100, $30,500 $(1,500) $56,500
<br />Construction
<br />Mixon $28,200 $26,500 $28,500 $(12,333) $34,500
<br />Construction Co.
<br />J. Wayne Poole, $18,594 $12,668 $21,874 $3,500 $19,598
<br />Inc
<br />Professional $45,900 $33,300 $46,300 $(3,210) $50,550
<br />Building Systems
<br />Progressive No bid
<br />Contracting Co.
<br />The Resolute $31,700 $26,700 $31,500 $(5,000) $32,000
<br />Building Co. '
<br />Riggs-Harrod $42,500 $36,000 $36,000 $65,000 $35,500
<br />Builders
<br />S&S Building and $28,600 $22,500 $70,200 $(10,500) $31,200
<br />Development '
<br />D. S. Simmons. $5,200 $34,000 $40,000 $23,200 $34,000
<br />Stonewall $19,675 $18,221 $68,485 n/c $31,013
<br />Construction Svcs
<br />Van Thomas $40,500 $41,000 $38,000 $(12,600) $43,800
<br />Contractor
<br />C. T. Wilson No bid
<br />DOT Const. * $42,289 $27,317 $46,480 $(22,753) $14,933
<br />
<br />
<br />* Did not obtain CDs from Designer
<br />
|