Browse
Search
ORD-2004-020 - Zoning Text Amendment for Land Clearing Waste Facilities
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2004
>
ORD-2004-020 - Zoning Text Amendment for Land Clearing Waste Facilities
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 10:25:07 AM
Creation date
2/9/2011 3:45:34 PM
Metadata
Fields
Template:
BOCC
Date
5/24/2004
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
d2
Document Relationships
Agenda - 05-24-2004-d2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2004\Agenda - 05-24-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
214 4 <br />e) The facility shall be accessed by a road or driveway adequate in <br />width to accommodate the proposed traffic aid of all-weather <br />construction. <br />f) Road access to the facility shall be adequately secured by means <br />of gates, berms, fences, etc. to prevent unauthorized access except <br />when an operator is on duty. <br />g) If the facility is located more than 500 feet from adjacent roadways <br />or adjacent properties no buffer is required. A 100-foot wide Type <br />A landscaped. buffer shall be provided between the Land Clearing <br />Waste Facility and State-maintained roadways or adjacent <br />properties if the facility is less than 500. feet from adjacent <br />roadways or adjacent properties. The landscaped buffer may be <br />located outside of the two (2) acre site. <br />h) Boundary limits of the facility shall be clearly identified by <br />monuments, fencing, iron pins, concrete markers, or-any <br />combination thereof. <br />i) The facility shall not be located within required stream buffers, <br />floodways, floodplains, utility easements, or septic system repair <br />areas. <br />j) -The facility shall not be lighted. <br />k) .The operator of the facility shall submit and receive approval of an <br />erosion control. plan with each application for a land clearing waste <br />facility. !n addition to the erosion control plan the following <br />regulations shall be required: <br />1) Land Clearing Waste shall be_restricted to the smallest area <br />feasible and compacted as densely as practical into cells. <br />2) One (1) foot of soil cover shall be applied monthly, or when the <br />active area reaches one acre in size, whichever occurs first. <br />3) 120 calendar days after completion of any phase of disposal <br />operations, or upon revocation of a permit, the disposal area <br />shall be covered with a minimum of one foot of suitable soil <br />cover sloped to allow surface water runoff in a controlled <br />manner. <br />4) ..County approved erosion control measures, structures, or <br />devices shall be utilized to prevent silt from leaving the site. <br />and to prevent: on-site erosion. <br />G:\Current Planning Division\Dave\Ordinances\LCWF Ordinance.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.