Browse
Search
NS - Grant - EMS Acceptance of HRSA Grant for Decontamination & Communication Equipment
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
BOCC Grants
>
2000 - 2009
>
2004
>
2004 Grants
>
NS - Grant - EMS Acceptance of HRSA Grant for Decontamination & Communication Equipment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 10:15:15 AM
Creation date
2/1/2011 3:51:08 PM
Metadata
Fields
Template:
BOCC
Date
4/13/2004
Meeting Type
Regular Meeting
Document Type
Grant
Agenda Item
5f
Document Relationships
Agenda - 04-13-2004-5f
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2004\Agenda - 04-13-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Orange County Emergency Management <br />EMS DETAILED BUDGET NARRAVTIVE <br />For each Critical Benchmark/Objective: Identify Critical Benchmark and Objective for <br />which equipment is to be purchased. Provide detailed description of each item to be <br />purchased with detailed specifications and projected cost of each item. <br />Critical Benchmark # 2-7 Decontamination System <br />Ensure that adequate portable or fixed decontamination systems exist for managing S00 adult <br />and pediatric patients and health care workers per 1, 000, 000 population, who have been <br />exposed to biological, chemical or radiological agents <br />Objective # 2-7a EMS Decon Capability <br />EMS Capability to decontaminate Snon-ambulatory and 1 S ambulatory patients an hour with <br />staffing available <br />Decontamination- $21,676.80 <br />Qty Item Price ea Extended price <br />1 Air shelters Model 216 (216 s ft) $9 460 00 $9460 <br /> q ~ .00 <br />2 Roll up man door (24" wide) $120.00 $240.00 <br />1 Connector Door $340.00 $340.00 <br />1 Center divider 310.40 $310.40 <br />2 Laundry port and cover $44.80 $89.60 <br />2 Three step shower stall $420.00 $840.00 <br />4 Utility Duct $44.80 $179.20 <br />1 Pre plumb system 703.20 $703.20 <br />1 Tent heater system (LP) 2446.40 $2446.40 <br />1 Water heater 1975.20 $1975.20 <br />2 Roll up pool $620.00 $1240.00 <br />1 Water hose package $224.80 $224.80 <br />C~ <br />OC EMS Detailed Budget Narrative 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.