Browse
Search
2004 NS Housing - Silver Fox Enterprises Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2004
>
2004 NS Housing - Silver Fox Enterprises Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2012 11:41:31 AM
Creation date
1/31/2011 11:52:27 AM
Metadata
Fields
Template:
BOCC
Date
3/4/2004
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
8c
Document Relationships
Agenda - 03-04-2004-8c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2004\Agenda - 03-04-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Katrina Alston <br />420 Northside Dr. <br />Chapel Hill <br />493-6664 <br />1 /14/04 <br />Exterior: <br />1. Install aluminum, continuous gutters and downspouts. Install plastic <br />splash-blocks under each downspout. <br />2. Replace the left/front corner trim on the fascia. <br />3. Install scrawl-space door of 3/4 inch plywood on a pressure treated frame <br />with galvanized hinges and a locking hasp. <br />4. Pressure wash the siding on the right side of the house. <br />5. Install vinyl sofFitt with ventilated panels every four feet. Install aluminum <br />fascia, window and door trim. <br />6. Remove junk car. <br />7. Seal the gap between the concrete and the siding at the rear door with <br />silicone caulk. <br />8. Replace the exterior storeroom door with a six panel, metal insulated door <br />unit, with weather-stripping, aluminum threshold and lockset to be keyed <br />_._ <br />ii i~ same a5 fhc ~-cGr uucr. <br />Roof: <br />1. Remove two courses of shingles on the left/rear gable. Install matching <br />shingles. <br />2. Install aluminum drip edge. <br />3. Install a shingle type ridge vent and matching shingles. <br />4. Cut the front/left side gable shingles. <br />5. Replace three plumbing boots. <br />4 <br />6. Remove the damaged caulk on the chimney and install new caulk. <br />
The URL can be used to link to this page
Your browser does not support the video tag.