Orange County NC Website
North Carolina.Department of Transportation 14 <br /> Division of Highways <br /> Secondary Road Addition Investigation Report <br /> County: ORANGE Co. File No: 0-01-36 Date: 9-28-10 <br /> Township: CHEEKS Div. File No: Div. No: 7 <br /> Local CEDAR POINTE DRIVE CEDAR POINTE <br /> Name: Subdivision Name: <br /> 0.15 MILES 20 FEET Surface I-2 GOOD <br /> Length: Width: Type: PVMT Condition: <br /> Surface 2INCHES ABC Base 8INCHES <br /> Thickness Base Type Thickness <br /> `Retaining <br /> Walls Within <br /> X <br /> *Bridges Yes No_X_ * Pipe > 48" Yes No_ _ Right of Way Yes No_X_ <br /> * If Yes -Include Bridge Maintenance Investigation Report <br /> Is this a subdivision street subject to the construction requirements for such streets? YES <br /> Recording Date: 6-16-98 Book: 80 Page: 196 <br /> Number of homes having entrances into road: 9 <br /> Other uses having entrances into road: Subdivision collector road for Sam Miller Drive <br /> If right-of-way is below the desired width, give reasons <br /> Right-of-Way Width: 50 feet under"Remarks and Recommendations." <br /> Is petition (SR-1) attached? YES <br /> Is the County Commissioners Approval (SR-2) attached? YES If not, why not? <br /> Is a map attached indicating information for reference in locating road by the <br /> Planning Department? YES <br /> Cost to place in acceptable maintenance condition: Total Cost: $ 0.00 <br /> Grade, drain, stabilize: $ 0.00 Drainage: $ 0.00 Other: $ 0.00 <br /> Remarks and Recommendations: Road meets minimum requirements. Recommend addition <br /> Submitted by: C.N. Edwards Reviewed and Approved: J.M. Mills <br /> DISTRICT ENGINEER DIVISION ENGINEER <br /> Reviewed and Approved <br /> BOARD OF TRANSPORTATION MEMBER: <br /> Do not write in this space- For Use by Secondary <br /> Roads Unit <br /> Petition# <br /> Form SR-4 (11/05/07) <br />