Browse
Search
ORD-2004-001 - Zoning Ordinance Amendment Article 6.18 & 8.8.17a-Telecommunications Towers & Equipment
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2004
>
ORD-2004-001 - Zoning Ordinance Amendment Article 6.18 & 8.8.17a-Telecommunications Towers & Equipment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 8:43:39 AM
Creation date
1/27/2011 2:06:30 PM
Metadata
Fields
Template:
BOCC
Date
2/3/2004
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
8i
Document Relationships
Agenda - 02-03-2004-8i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2004\Agenda - 02-03-2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a) Information to be provided. All telecommunication providers who elect to <br />construct facilities on properties in the Plan shall provide ali necessary <br />and requested information to the County's telecommunications <br />consultant. <br />b) Plan modification. After adoption of the initial Plan any subsequent <br />modification of the Plan maybe considered annually at the February <br />Quarterly Public Hearing. Any applicant requesting modification of the <br />Plan shall make application to the Zoning Officer on or before December <br />1st of each year. The fee for modifying the Plan shall be that as set forth <br />in the Orange County Schedule of Fees. <br />c) Withdrawal from the Plan. Withdrawal from the Plan is permitted if any <br />owner submits, to the Planning Director, a notarized statement requesting <br />withdrawal from the Plan. <br />*6.19 Federa! Wetlands Permi#s. <br />*Amended <br />1/8/90 If a developer, corporation, private landowner or other person proposes to <br />perform construction/filling activities in or near a lake, stream, creek, tributary or <br />any unnamed body of water and its adjacent wetlands, Federal permit <br />authorization may be required by the U.S. Army Corps of Engineers prior to <br />commencement of earth-disturbing activities. Filling activities include, but are not <br />limited to, construction of road crossings, sewer or utility line installations, <br />grading, placement of spoil from ditching or other excavations, or placement of fill <br />for commercial or residential development. <br />A wetlands determination and specific permit requirements may be obtained from <br />the Raleigh Field Office of the U.S. Army Corps of Engineers. <br />6.20 Large Ground Absorption System (3,000 gals. per day and Package Sewage <br />Treatment Plants Prohibited !n AR Districts and Rural Buffer Districts <br />*6.20.1 <br />*Amended <br />4/4/88 Ground absorption systems with a design capacity of 3,000 gallons per day or <br />more and package treatment plants for sanitary sewage disposal are expressly <br />prohibited in the AR districts and Rural Buffer Districts as shown in the adopted <br />Comprehensive Plan except as may be approved through a Special Use Permit <br />or a Planned Development District. <br />*6.21 Mobile Home Standards <br />"Amended <br />3-18-86 <br />6-25-0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.