Browse
Search
2005 S Aging - Rural Capital Program Grant Agreement for Public Body Organizations $6435
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2005
>
2005 S Aging - Rural Capital Program Grant Agreement for Public Body Organizations $6435
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2012 11:28:24 AM
Creation date
1/20/2011 12:42:18 PM
Metadata
Fields
Template:
BOCC
Date
12/5/2005
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
8a
Document Relationships
Agenda - 12-05-2005-8a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2005\Agenda - 12-05-2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(1) Apply those insurance proceeds to the cost of replacing the damaged <br />or destroyed Project property taken out of service, or <br />(2) Return to the Department an amount equal to the remaining State <br />interest in the damaged or destroyed Project property. <br />j. Transportation -Hazardous Materials. The Contractor agrees to comply with <br />applicable requirements of U.S. Pipeline and Hazardous Materials Safety Administration <br />regulations, "Shippers -General Requirements for Shipments and Packagings," 49 C.F.R. Part <br />173, in connection with the transportation of any hazardous materials. <br />k. Misused or Damaged Proiect Prooertv. If any damage to Project property <br />results from abuse or misuse occurring with the Contractor 's knowledge and consent, the <br />Contractor agrees to restore the Project property to its original condition or refund the value of <br />the State interest in that property, as the Department may require. <br />I. Responsibilities after Proiect Closeout. The Contractor agrees that Project <br />closeout by the Department will not change the Contractor's Project property management <br />responsibilities as stated in Section 14 of this Agreement, and as may be set forth in <br />subsequent Federal and State laws, regulations, and directives, except to the extent the <br />Department determines otherwise in writing. <br />Section 15. Insurance. In addition to other insurance requirements that may apply, the <br />Contractor agrees as follows: <br />a. Minimum Requirements. At a minimum, the Contractor agrees to comply with <br />the insurance requirements normally imposed by North Carolina State and local laws, <br />regulations, and ordinances, except to the extent that the Department determines otherwise in <br />writing. <br />b. Flood Hazards. To the extent applicable, the Contractor agrees to comply <br />with the flood insurance purchase provisions of Section 102(a) of the Flood Disaster Protection <br />07-SC-056 Page 46 of 59 <br />Orange County <br />
The URL can be used to link to this page
Your browser does not support the video tag.