Browse
Search
2005 S Aging - Rural Capital Program Grant Agreement for Public Body Organizations $6435
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2005
>
2005 S Aging - Rural Capital Program Grant Agreement for Public Body Organizations $6435
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2012 11:28:24 AM
Creation date
1/20/2011 12:42:18 PM
Metadata
Fields
Template:
BOCC
Date
12/5/2005
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
8a
Document Relationships
Agenda - 12-05-2005-8a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2005\Agenda - 12-05-2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) Maintain written documentation to support each step of the <br />procurement process. <br />o. Design-Bid-Build Projects. The Design-Bid-Build method of construction is <br />where there are separate contracts and procurement processes for the design and construction. <br />Typically the designer coordinates the numerous prime contractors that are involved in the <br />construction process. The Contractor may use design-bid-build procurements to implement its <br />projects after it has complied with applicable State requirements and obtains approval from the <br />Department prior to solicitation and award of the contract. <br />p. Design-Build Projects. The Design-Build method of construction is where a <br />single contractor is given responsibility for both design and construction, thus eliminating an <br />intermediate procurement step with possible time saving, and more effective coordination and <br />opportunities for cost savings. Currently, this procurement method is not an allowable method <br />of procurement by the State of North Carolina. The Contractor may request to use the design- <br />build method as an "alternate" method. Submission of justification must be presented to the <br />State Building Commission for a 2/3-majority vote of approval. One of the drawbacks of design- <br />build is that the owner does not have an independent source (the A/E in traditional construction) <br />overseeing design implementation and verifying conformance with the drawings and <br />specifications. <br />q. Competitive Proposal/Request for Proposal (RFP). The competitive proposal/ <br />request for proposal (RFP) method of procurement is normally conducted with more than one <br />source submitting an offer, i.e., proposal. Either a fixed price or cost reimbursement type <br />contract is awarded. This method of procurement is generally used when conditions are not <br />appropriate for the use of sealed bids. The Contractor acknowledges that certain restrictions <br />apply under North Carolina law for use of the RFP method and these restrictions and exceptions <br />are discussed below. <br />07-SC-056 Page 35 of 59 <br />Orange County <br />
The URL can be used to link to this page
Your browser does not support the video tag.