Browse
Search
2005 S Aging Transp Mgt for Public Body Org for Community Transp Operating in Urban Counties
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2005
>
2005 S Aging Transp Mgt for Public Body Org for Community Transp Operating in Urban Counties
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 3:52:51 PM
Creation date
1/20/2011 12:35:52 PM
Metadata
Fields
Template:
BOCC
Date
12/5/2005
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
8a
Document Relationships
Agenda - 12-05-2005-8a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2005\Agenda - 12-05-2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to the Contractor, or until all audit exceptions have been resolved, whichever is longer, in <br />accordance with "Records Retention and Disposition Schedule -Public Transportation Systems <br />and Authorities, April 1, 2006," at (http://www.ah.dcr.state.nc.us/records/local/). <br />c. Access to Records of Contractor and Subcontractors. The Contractor shall <br />permit and shall require its third party contractors to permit the Department or its authorized <br />representatives to inspect all work, materials, payrolls,. and other data and records with regard <br />to the Project, and to audit the books, records, and accounts of the Contractor pertaining to the <br />Project. The Department shall reserve the right to reject any and all materials and workmanship <br />for defects and incompatibility with Project Description or excessive cost. The Department shall <br />notify the Contractor, in writing, if materials and/or workmanship are found to be unacceptable. <br />The Contractor shall have ninety (90) days from notification to correct defects or to provide <br />acceptable materials and/or workmanship. Failure by the Contractor to provide acceptable <br />materials and/or workmanship, or to correct noted defects, shall constitute a breach of contract. <br />d. Proiect Closeout. The Contractor agrees that Project closeout does not alter <br />the reporting and record retention requirements of this Section 6 of this Agreement. <br />Section 7. Proiect Completion. Audit. Settlement, and Closeout. <br />a. Project Completion. Within ninety (90) calendar days following Project <br />completion, the end of the Project's period of performance, or termination by the Department, <br />the Contractor agrees to submit a final reimbursement request to the Department for eligible <br />Project expenses. <br />b. Financial Reporting and Audit Requirements. In accordance with OMB <br />Circular A-133, "Audits of State, Local Governments and Non-Profit Organizations," revised on <br />June 27, 2003, and N.C.G.S. 159-34, the Contractor shall have its accounts audited as soon as <br />possible after the close of each fiscal year by an independent auditor. The Contractor agrees to <br />submit the required number of copies of the audit reporting package to the Local Government <br />Commission four months after the Contractor's fiscal year-end. <br />Project 07-US-056 Page 17 of 49 <br />Orange County <br />
The URL can be used to link to this page
Your browser does not support the video tag.