Browse
Search
2005 NS Housing- William Long Construction Co Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2005
>
2005 NS Housing- William Long Construction Co Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2011 11:03:42 AM
Creation date
1/13/2011 4:17:41 PM
Metadata
Fields
Template:
BOCC
Date
11/15/2005
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5g
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~.: <br />g <br />Marian Jackson Page 6 <br />124 Merritt Mill Rd. <br />Chapel Hill, NC 27514 <br />October 5, 2005 <br />EL. ECTRICAL: <br />12. Install a GFI protected receptacle on the exterior wall of the <br />Laundry room. Install an approved weather resistant cover for the <br />receptacle per code. <br />13. Install a new wall switch for the dining room ceiling light. <br />14. Install a new ceiling light fixture in the living room. Price range <br />for new fixture: 25.00- 35.00 <br />PLUMBING: <br />1. Install new supply lines and drain lines in the bath & laundry room. <br />All rough in plumbing shall be installed & inspected before the <br />concrete is poured. <br />2. Install a 1-piece fiberglass tub/shower unit. The unit shall be complete <br />with shelves, acrylic grab bars &slip-resistant textured bottom. <br />Install a single control tub/shower faucet, drain line assembly <br />& trip lever. Make all plumbing connections. <br />3. Install ahand-held shower arm mount set. Install an extra clip <br />so the tenant may use a shower chair. <br />4. Install a handicap commode. The commode shall be a Kohler or <br />pre-approved equal. Install a new supply line & cut-off. <br />Make all plumbing connections. <br />5. Reinstall the vanity. Install a new 1 piece molded cultured sink/ <br />vanity top. Install single lever lavatory faucet. The faucet shall be <br />a Delta orpre-approved equal. Install new supply lines & cut-offs. <br />6. Install a five piece bathroom accessory kit. The kit shall include the <br />following: 18" towel bar, 24" towel baz, tissue roll holder, <br />toothbrush/tumbler holder & soap dish. <br />7. Install a washing machine box in the laundry room. Make all <br />plumbing connections to the outlet box. <br />
The URL can be used to link to this page
Your browser does not support the video tag.