Browse
Search
2005 NS Housing- William Long Construction Co Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2005
>
2005 NS Housing- William Long Construction Co Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2011 11:03:42 AM
Creation date
1/13/2011 4:17:41 PM
Metadata
Fields
Template:
BOCC
Date
11/15/2005
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5g
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1Vlarian Jackson <br />124 Memtt Mill Rd. <br />Chapel Hill, N.C. 27514 <br />October 5, 2005 <br />ELECTRICAL: <br />1. Remove the old meter base & conduit that is not being used. <br />Cover all missing sections of siding with smooth white coil stock. <br />Caulk all small holes with latex caulk before painting siding. <br />2. Install two GFI protected receptacles in the kitchen. <br />3. Bathroom- Install a recessed light over the tub/shower controlled <br />by a wall switch. Install a vanity bar light over the mirror <br />controlled by a wall switch. <br />4. Install an exhaust fan located within 2ft of the tub/shower. <br />The exhaust fan shall be controlled by a wall switch and capable <br />of removing 110 cfm. Vent the exhaust through the boxing per <br />code. <br />5. Install two (2) GFI receptacles in the bathroom. <br />6. Laundry Room- Install two recessed light fixtures on the ceiling <br />controlled by a wall switch. Center the lights on the ceiling. <br />7. Install three GFI receptacles in the laundry room. Install one on <br />the door wall and two on the interior wall. <br />8. Install a new circuit for the hot water heater. All connections shall <br />be made in a junction box. <br />9. Install a motion detector light fixture beside the back <br />door. The light shall be controlled by a wall switch in the laundry <br />room. Install a new breaker for the hot water heater. <br />(AIl electrical work shall pass the N.C. Electrical Codes) <br />10. Install hard-wired smoke detectors with battery back-up on the 1st <br />floor. Install a total of four on the 1st floor. <br />Install the smoke detectors in all sleeping rooms, living room and <br />Laundry room. Install new battery operated smoke detectors on the <br />2na floor. Install a total of three on the 2na floor. <br />11. Install arc fault interrupters on all sleeping room circuits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.