Browse
Search
2005 NS Housing- William Long Construction Co Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2005
>
2005 NS Housing- William Long Construction Co Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2011 11:03:42 AM
Creation date
1/13/2011 4:17:41 PM
Metadata
Fields
Template:
BOCC
Date
11/15/2005
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5g
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Marian Jackson <br />124 Merritt Mill Rd. <br />Chapel Hill, N.C. 27514 <br />October 5, 2005 <br />BATHROOM & LAUNDRY: <br />Page 4 <br />6. Install a new vinyl floor in the bathroom & laundry room. The <br />vinyl to cost not less than $ 14 sq yd. Install metal trim at all <br />door openings. <br />7. Install a privacy lockset and door bumper on the bathroom door. <br />8. Remove the exterior wall covering between the new addition ~i <br />the main house. Frame an opening with a 2x 10 header to receive <br />a 36"bathroom door unit. Install a 36" door & jamb. Prime and <br />paint the door, jamb and trim with semi-gloss latex paint. The paint <br />shall cover completely. Note: Lead paint maybe present on the wall <br />covering. Use Lead Based Paint Safe Work Practices. <br />9. Install a new cased opening between the Laundry room and the <br />kitchen. The opening shall match the existing framing. Install <br />new matching casing on both sides of the opening. Prime & paint <br />the cased opening with semi-gloss latex paint. The paint shall <br />cover completely. <br />10. Reinstall the existing vinyl windows in the laundry room. <br />(Refer to plan) <br />11. Install %2 OSB plywood & tyveck on the exterior walls of the <br />addition. <br />12. Install D-5 vinyl siding on the exterior walls. Prepare the exterior <br />for coil stock & soffit. Install smooth white coil stock on the fascias <br />& eves. Install vented vinyl soffit on the overhangs. _ <br />INSULATION: <br />1. Install R-19 insulation in the bathroom & laundry ceiling. <br />2. Install R-13 insulation in the exterior walls of the new addition. <br />3. Install a 6 mil vapor barrier in the crawlspace. <br />
The URL can be used to link to this page
Your browser does not support the video tag.