Orange County NC Website
Marian Jackson <br />124 Merritt Mill Rd. <br />Chapel Hill, N.C. 27514 <br />October 5, 2005 <br />ROOF: <br />4. Remove the center chimney below the roof-line. Install matching <br />plywood and framing. <br />5. Remove the flashing on the side chimney. Install an approved <br />corrosion resistive flashing on the chimney. Install step and <br />counter-flashing. <br />WINDOWS: <br />1. Caulk around all existing windows where the window frame <br />meets the coil stock. The caulldng shall be 100% white silicone. <br />BATHROOM & LAUNDRY: <br />1. Remove the rear section (Bathroom & Laundry Room) to the ground. <br />Remove footings if they exist. Dig, frame & pour new footings <br />and install monolithic slab concrete floor. (Floor plan to match <br />the existing foot-print.) Install 6 mil poly & wire mesh. <br />(Note) Lead Based Paint is present on the bathroom door casing. <br />Use Lead Based Paint Safe Work Practices. <br />2. Frame the bathroom & laundry room using 2x6 walls, 2x8 ceiling <br />joists ,2x8 rafters & 5/8 plywood. All framing shall pass the NC <br />Building Codes. The new rafters shall rest on the main plate of the <br />unit. The rafters shall be on a 4/12 pitch. Refer to plan. <br />3. Install MR sheetrock on all walls & ceiling. Finish the sheetrock <br />smooth. Prime & paint the sheetrock with semi-gloss latex paint. <br />The paint shall cover completely. (Bathroom & laundry) <br />4. Insta113 %4 baseboard & shoe molding in the bathroom and laundry <br />room. Prime & paint the molding with semi-gloss latex paint. The <br />paint shall cover completely. <br />5. Install a new 36" wall cabinet in the laundry room. Install the wall <br />cabinet on the end wall. (Refer to plan). The finish shall be white. <br />