Browse
Search
2005 NS Housing- William Long Construction Co Housing Rehabilitation Contract Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2005
>
2005 NS Housing- William Long Construction Co Housing Rehabilitation Contract Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2011 11:03:42 AM
Creation date
1/13/2011 4:17:41 PM
Metadata
Fields
Template:
BOCC
Date
11/15/2005
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5g
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />Marian Jackson <br />124 Merritt Mill Rd. <br />Chapel Hill, NC 27514 <br />October 5, 2005 <br />Ezterior <br />Page 1 <br />1. Install 10 ft of gutter board on the rear section of the unit. Prime <br />the new wood with an oil based primer before the coil stock is <br />installed. <br />2. Wrap ALL fascias, eves & overhangs with smooth white coil stock. <br />Repair all damaged wood before the coil stock is installed. <br />Install vented soffit on all overhangs. Install solid soffit in the <br />gable overhangs. Install solid soffit on the front porch ceiling. <br />Prime all new wood with an oil based primer. <br />3. Install a pressure treated crawlspace door and frame. Install a 2x4 <br />frame and 3/aD7 treated plywood door. <br />Install galvanized hinges & locking hasp. <br />4. Install continuous aluminum gutters and downspouts. Install <br />splash blocks under each downspout. Install gutters on all fascias. <br />5. Remove the front porch floor. Repair 20 ft of damaged outer band. <br />Install treated lumber. All nails shall be galvanized. <br />6. Repair five (5) damaged floor joists on the front porch. Install <br />matching treated lumber. All nails shall be galvanized. <br />7. Install a new pressure treated front porch floor. Install 5/4 decking. <br />Rabbet the decking against the house to 3/a" so the decking will slide <br />under the aluminum siding. Install an approved non- corrosive <br />flashing where the decking meets the siding. <br />8. Install a 36" wood door on the front of the unit. Install the door on <br />the existing frame. Install new hinges, threshold and weather- <br />stripping. Install a keyed lockset & deadbolt keyed alike. Install a <br />wide door viewer. Consult the homeowner for the correct height. <br />Prime & paint the door with semi-gloss~latex paint. <br />
The URL can be used to link to this page
Your browser does not support the video tag.