Browse
Search
2008-123 Housing - Affordable Housing Bond Development Agreement TBLF ENO HAVEN LLC $1,000,000
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-123 Housing - Affordable Housing Bond Development Agreement TBLF ENO HAVEN LLC $1,000,000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2012 9:57:25 AM
Creation date
1/10/2011 12:52:33 PM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
6c
Document Relationships
Agenda - 08-19-2008- 6c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2008\Agenda - 08-19-2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Contingency: The amount is the net result of all other budget changes. <br />Approved $131,969.02 in change orders through CO#3, net of value engineering changes. <br />Architect's Fee -Design: Reduced per the actual cost. <br />Engineering: Increased to deal with rock and soil issues. <br />Constructidn Loan Orig. Fee: Increased per the actual cost. <br />Construction Loan Interest: Decreased based upon experience with the Exchange Loan. Projects a permanent loan closing N <br />Conservatively projects permanent loan dosing November 30, 2011. <br />Prope Appraisal: Decreased per the actual cost. <br />Environmental Report: Decreased per the actual cast. <br />Market Study: Decreased per the actual cost. <br />Title and Recording: Increased per the actual cost. <br />Other Attorney's Fees: Increased per the actual cost and to pursue a waiver of impact fees. <br />Tax Credit Application Fees: Increased per the actual cost. <br />Operating Reserve: Increased per the requirements of CICCAR <br />Hazard Insurance: Not originally budgeted. <br />BB&T Inspection Fees: Not originally budgeted. <br />on Value <br />Attic R 38 Insulation Credit from CO#1: Credit of $9,349.00 <br />Rock removal credit from CO#2: $5,800.00 <br />Elimination of pipe insulation above and beyond code requirements: Credit of $35,000.00 <br />Elimination of brick per VE suggestions 2 & 6: Credit of $5,359.26 <br />Change of board and batten to vinyl: Credit of $8,500.00 <br />Gucrent Total = S64.008.26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.