Orange County NC Website
OR <br />1.03 <br />A letter of credit, escrow agreement, or bond shall be submitted to secure <br />construction and inspection of Charlotte Mountain Road to Class B private <br />road standards. An estimate of the construction and certification costs must be <br />prepared by a certified/licensed engineer or grading contractor and submitted- <br />to the Planning and Inspections Department. The financial guarantee must <br />reflect 110 % of that estimate and be issued by an accredited financial <br />institution licensed to do business in North Carolina. <br />The document describing development restrictions to be recorded with the <br />Final Plat shall state that the financial guarantee will not be released until the <br />road construction has been certified W a North Carolina Professional Engineer <br />or a North Carolina Registered Land Surveyor. <br />3. An erosion control plan for construction of the road shall be submitted by the <br />applicant for review and approval by the Orange County Erosion Control <br />Division. <br />4. A Private Road Maintenance Agreement for Charlotte Mountain Road shall be <br />submitted to the Planning and Inspections Department and approved by the <br />County Attorney. <br />5. A 10' by 70' sight triangle shall be shown at the entrance of the subdivision. <br />6. .- . All lots shall access onto the new subdivision roads. This restriction shall be <br />stated in a document describing development restrictions and requirements to <br />be prepared by Planning Staff and recorded concurrently with the Final Plat. <br />7. Approved street name signs shall be erected at the intersection of streets as <br />required in Section IV-B-3-c-12 of the Orange County Subdivision <br />Regulations. Evidence shall be submitted by the applicant that the sign is in <br />place or a copy of the receipt for purchase of the sign shall be submitted to the <br />Planning Department. <br />C. Land Use Buffers and Landscaping <br />1. Landscaping shall be preserved as indicated on the approved landscape plan, <br />and must be inspected and approved by the Planning and Inspections <br />Department. <br />2. Provisions for protection of existing trees as shown on the approved landscape <br />plan shall be included in a document describing development restrictions and <br />requirements to be prepared by Planning Staff and recorded concurrently with <br />the Final Plat. <br />3. A Type A Land Use Buffer shall be provided along New Sharon Church Road. <br />The buffer shall be 30 feet in width and provide sufficient vegetation to meet <br />the standards of Section IV-B-8-e of the Subdivision Regulations. Said buffer