Browse
Search
Agenda - 12-14-2010 - 8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 12-14-2010 - Regular Mtg.
>
Agenda - 12-14-2010 - 8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2010 12:30:55 PM
Creation date
12/10/2010 12:30:55 PM
Metadata
Fields
Template:
BOCC
Date
12/14/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 12-14-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />submitted comments to the consultant to incorporate into the scope. Attachment 1 is the Study <br />Scope Outline Draft. The anticipated study timeline is 12-15 months (Attachment 2). <br />NCDOT requires the creation of a steering committee to guide the study. The steering <br />committee composition requirements were provided to Orange County and Chapel Hill Transit. <br />This committee will include the full range of human service stakeholders as well as local <br />government partners and general transit users. The committee will be formed after the study <br />scope of work is finalized and the contract is signed. The estimated timeline is January 2011. In <br />addition to the steering committee, the study team (Orange County Planning, Chapel Hill Transit <br />and NCDOT) will develop a reporting mechanism to provide timely study updates to the elected <br />officials and seek guidance and feedback. <br />FINANCIAL IMPACT: <br />• There is no financial impact associated with the study. NCDOT sponsors the study <br />100%. The study cost will be developed after the scoping process is completed. <br />• The financial impact of study recommendations will be determined once the study is <br />completed. The study will be completed within the 15-month timeframe with interim <br />phases to assist the County through other decision phases. <br />RECOMMENDATION(S): The Manager recommends the Board receive the report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.