Browse
Search
Agenda - 12-14-2010 - 7b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 12-14-2010 - Regular Mtg.
>
Agenda - 12-14-2010 - 7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2010 12:24:13 PM
Creation date
12/10/2010 12:24:06 PM
Metadata
Fields
Template:
BOCC
Date
12/14/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7b
Document Relationships
Minutes 12-14-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
ORD-2010-096 Approval of Health Dept Expansion - Whitted Human Service Building
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />Based on the Board's direction that the arrangement not cost the County money, it is also <br />assumed the costs of that work would be borne by new users. <br />The Health Department has requested use of the second floor area, which will make additional <br />offices available for employees now sharing offices; and for the development of rooms for <br />patient education and general training. Reinforcement in the area cited as #3 above will resolve <br />any structural questions that may exist in the area designated for conference/training on this <br />floor. <br />The structural work has been designed and is part of the pending bid package, which will be <br />released immediately following the Board's approval of this item. The bid isolates the costs of <br />the structural work separately so it can be awarded in part or in whole; and the cost parsed to <br />the appropriate parties. The construction estimate for the structural work in all three areas <br />totals $80,000. <br />The structural work associated with the old Library space will not benefit the clinic in any way, <br />but significant operational disruption and destruction of newly renovated space would be <br />necessary if it were done later. <br />Major renovation will be done to approximately 14, 814 square feet within the Whiffed Building, <br />with the remaining space receiving cosmetic work (paint/carpet). Renovation costs for the <br />Whiffed Building are estimated at $99/square foot of renovated area which compares favorably <br />to the estimated $300 per square foot which can be expected for new construction of medical <br />clinic space. Higher renovation costs per square foot can be expected at the Whiffed site due <br />in part to the age and type of construction of the building and the proposed use of the space. <br />Renovations at Hillsborough Commons, including all sustainable design items (windows, <br />skylights, etc) and the facade work were completed for $67.60 per square foot. <br />At the conclusion of this renovation project, the Health Department will have approximately <br />38,000 Gross Square Feet (GSF) square feet available for operational use, compared to an <br />estimated 17,000 GSF currently assigned. <br />This plan provides Health and Dental clinic space suitable for an estimated seven to ten years. <br />The plan, while not "new-building" perfect, effectively uses the existing Whiffed structure to <br />deliver quality clinic space in a reasonable timeframe and at a reasonable cost. Where <br />structure has created a costly or insurmountable impediment to the desired usage goal, <br />technology or other work around strategies have been recommended (e.g. monitoring waiting <br />areas via camera; personally escorting patients to clinic space). <br />The revised timeline by which the project would be delivered is as follows: <br />TASK PROPOSED <br />BEGINNING <br />DATE END BY <br />DATE <br />BOCC Action: A royal of lans for the renovation of s ace 12/14/10 12/14/10 <br />Biddin hase 12/20/10 1/19/11 <br />BOCC Action: Bid Award 2/15/11 2/15/11 <br />Phase 1 Construction -Buildin A est. 90 da duration ,Health Clinic move 2/16/11 5/23/11 <br />Phase II Construction -Buildin Best. 45 da duration 5/26/11 7/11/11 <br />Dental move from Carr Mill 7/25/11 7/29/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.