Orange County NC Website
PLANNING ELEMENTS <br /> NC LOCAL GOVERNMENT 10 YEAR SOLID WASTE MANAGEMENT PLAN <br /> PLANNING YEARS 2008 through 2018 <br /> Check appropriate element <br /> Reduction Disaster Response Illegal DisposaULiter Disposal Collection <br /> ✓Transfer outside geographic Education with cornmunity& Collection of Computer Equipment and Purchasing Recycled Special Waste <br /> area through school Televisions Products <br /> Composting and Mulching Incineration with/without energy Management of Abandoned Manufactured Recycling and Reuse <br /> recovery Homes <br /> COMPLETED ACTIONS INCOMPLETE ACTIONS NEW/REVISED ACTIONS <br /> KEY ACTIONS KEY ACTIONS WHY INCOMPLETE? KEY ACTIONS DATE DUE ESTIMATED TONS <br /> DIVERTED IN l OTH YEAR <br /> Orange County hauled MSW None of the three The landfill has not Local governments Late 2010-early 2011 n/a.All tons of MSW hauled <br /> will go to Durham Transfer Towngovernments closed yet.There are at determine if they want by local governments will be <br /> Station once Orange has determined least 2.5 years for this to work together to directed somewhere else for <br /> County's landfill closes. where they will decision to be made, direct all waste to a at least 3-5 years per Board of <br /> Private companies haul waste send their MSW although Orange County single destination, Commissioners resolution <br /> out of County when it is to after December is interested in resoiving develop a contract to do while other options are being <br /> their advantage. 2012 when the this as soon as possible. so and sign an considered.There is no direct <br /> Local governments now have landfill is SWAB preparing agreement. SWAB to impact on diversion except <br /> an interlocal agreement projected to close. recommendation on ILA recommend revisions to that by 2013-14, 100%of <br /> (LILA)requiring delivery to They will be this fall. current Interlocal MSW will be diverted from <br /> Orange Co.Landfill. forced to make Agreement Orange County for several <br /> that deterznination. years at least. <br /> ITNC,in Sept 2008,on The Town& <br /> request from the County to County managers <br /> help conserve landfill space, are meeting to <br /> began directing their MSW to decide if they want <br /> the private transfer station to work together <br /> owned by their hauling and send all waste <br /> contractor.Formerly IJNC to one location to <br /> had directed its waste to perhaps get better <br /> Orange County(5,200 ave pricing for a long <br /> tpy) term larger <br /> contract.No <br /> SWAB considered some decisions have <br /> variations on flow control been made.It is <br /> perhaps integrated into not obvious how <br /> franchise hauling. much leverage <br /> County decided not to build a they will get from <br /> transfer station when landfill going together v. • <br /> closes in 2013.This was the savings to each <br /> stated to be an interim term going alone to the <br /> decision 3-5 ears. No local closest facilit that <br /> g0 <br />