Browse
Search
Agenda - 12-06-2010 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 12-06-2010 - Regular Mtg.
>
Agenda - 12-06-2010 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2015 2:04:13 PM
Creation date
12/3/2010 11:41:41 AM
Metadata
Fields
Template:
BOCC
Date
12/6/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 12-06-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The project is being developed and constructed along the following timeline: <br />TASK PROPOSED <br />BEGINNING <br />DATE END BY <br />DATE <br />BOCC Action re: Dental Clinic Consolidation 9121/10 9/21/10 <br />Preparation of construction documents suitable for bidding the project <br />and submittin for re ulato a royal 9/22/10 11/29/10 <br />Biddin hase 12/8/10 12/29/10 <br />BOCC Action: Phase 2 Bid Award 1/20/11 1/20/11 <br />Phase !Construction - Building A (est. 90 day duration), Health Clinic <br />move 1/21/11 4/21/11 <br />Phase II Construction - Buildin Best. 45 da duration 4!21/11 6/5/11 <br />Dental move from Carr Mill 6/13/11 6/17/11 <br />FINANCIAL {MPACT: Deve{opment costs for this project are estimated at $1.47 million. This <br />estimate, developed by staff, CRZ and CostPlus Estimators, a third party estimating firm, <br />includes: design, construction, structural improvements, site improvements, all clinic equipment <br />and furniture, as well as a contingency to support costs of unforeseen conditions. <br />Adequate funding is available for the project within the Medicaid Maximization capital project <br />(#30012) and the Dental Equipment capital project (#30039). Requisite budget amendments <br />will be established simultaneous to the construction bid award scheduled for January 20, 2011. <br />RECOMMENDATION(S): The Manager recommends the Board review and approve the <br />project and the estimated project costs as presented. <br />
The URL can be used to link to this page
Your browser does not support the video tag.