Browse
Search
Agenda - 12-06-2010 - 4k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 12-06-2010 - Regular Mtg.
>
Agenda - 12-06-2010 - 4k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2010 11:29:05 AM
Creation date
12/3/2010 11:29:01 AM
Metadata
Fields
Template:
BOCC
Date
12/6/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4k
Document Relationships
2010-162 Planning - Hillsborough Stormwater Program Management & Erosion Control Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2010
Minutes 12-06-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 <br />A3) -EXCLUDED FUNCTIONS <br />Notwithstanding any provision of the Interlocal Agreement, or the provisions of the Annual <br />Workplan, the Services to be provided by the County shall not include the following: <br />1. LEGAL MECHANISIMS TO IlVIPLEMENT PERMIT -COUNTY will NOT be <br />responsible for the adoption of legal mechanisms, such as regulations, ordinances, <br />policies and procedures to prohibit illicit connections, spills and illegal dumping into the <br />Towns Municipal Separate Storm Sewer System or to otherwise implement the <br />provisions of the Permit. <br />2. MAIl~TTENANCE OF ADEQUATE FUNDING AND STAFFING -COUNTY will NOT <br />be responsible for the TOWN's responsibility under the Permit to maintain adequate <br />funding and staffing to implement and manage the provisions of the Permit. <br />3. STORM DRAIN SYSTEM INVENTORY -COUNTY will NOT be responsible for <br />maintaining an inventory of the Town's storm drain system. However, the County WILL <br />provide updated data, including GPS locations of the Town's storm drain system (if <br />available) as part of its routine duties described in the work plan. This may include <br />mapping locations of stormwater BMPs approved through the new development process <br />and outfalls found during illegal discharge inspections. <br />4. STORM DRAIN SYSTEM MAPPING -COUNTY will NOT be responsible for <br />developing a map containing the location of pipes, outfalls, basins, or other storm water <br />treatment or conveyance devices, nor their receiving waters. However, the County WILL <br />maintain this data on the County GIS database and updated it as information is obtained <br />through routine completion of duties described in the work plan. <br />5. STORM DRAIN SYSTEM MAINTENANCE -COUNTY will NOT be responsible for <br />installation or maintenance of any pipes, outfalls, basins, or other storm water treatment <br />or conveyance devices, nor their receiving waters. <br />6. SOIL EROSION & SEDIMENTATION CONTROL FOR PUBLICLY FUNDED <br />PROJECTS -All publicly funded projects fall under the jurisdiction of the North <br />Carolina. Division of Land Resources, Land Quality Section. <br />7. IMPLEMENTATION OF RECOMMENDED STORMWATER BEST MANAGEMENT <br />PRACTICES FOR TOWN FACILITIES -COUNTY will NOT be responsible for the <br />installation, maintenance, or execution of any stormwater management structures or <br />practices. <br />8. LAB COSTS ASSOCIATED WITH SAMPLING THAT MAY BE NECESSARY FOR <br />ILLICIT DISCHARGE ELIlVIINATION AND DETECTION -COUNTY will NOT be <br />responsible for any water quality sample collection or analysis costs, unless it is <br />determined by both parties to be feasible as part of its routine duties described in the <br />work plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.