Browse
Search
Agenda - 12-06-2010 - 4k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 12-06-2010 - Regular Mtg.
>
Agenda - 12-06-2010 - 4k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2010 11:29:05 AM
Creation date
12/3/2010 11:29:01 AM
Metadata
Fields
Template:
BOCC
Date
12/6/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4k
Document Relationships
2010-162 Planning - Hillsborough Stormwater Program Management & Erosion Control Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2010
Minutes 12-06-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Town of Hillsborough Stormwater Management Program <br />Work Plan September 2010 <br />5. Post-Construction Stormwater Management <br />• <br />.. .. <br />.. - <br />New Development Review proposed new development projects to ensure compliance with the Town's <br /> <br />Review <br />stormwater post-construction requirements SRO <br /> Inspect new structural stormwater BMPs at the time the project is complete to ensure <br /> <br />compliance with approved plans SRO, OCED <br /> Map new BMPs using GPS/GIS technology SRO, OCED <br />BMP Inspections Review required annual inspection reports submitted by the BMP the owner SRO <br /> Conduct follow-up inspections as warranted and provide inspection reports to owner <br /> <br />outlining follow up actions SRO, OCED <br /> Issue notice of violations if warranted SRO, Hillsborough <br />Education/Outreach This portion of the post-construction stormwater management program is part of the SRO <br />OCED <br /> overall education/outreach component described in items 1 and 2 above , <br /> Identify at least one new possible stormwater retro-fit location annually SRO <br /> Evaluate sites already identified based on land availability, willing ownership, potential SRO <br /> for pollution reductions, and other pertinent variables <br />Retro-fit Opportunities Rank these sites and evaluate grant availability and/or other funding sources to <br /> implement retro-fits SRO <br /> Provide this information to the state and identify potential partnerships to develop and <br /> <br />fund retro-fit projects SRO <br /> Through an inter-local agreement, the Orange County Erosion Control Division <br /> reviews and approves stormwater management plans for new development. An <br /> electronic database is maintained on each permitted site including inspection reports. <br />Evaluation Information regarding number of plans reviewed, BMP inspections and other pertinent OCED <br /> information is tracked and will be included in the annual report to the state for <br /> development within the Town's jurisdiction. Orange County also provides this <br /> information to NCDWQ pursuant to their Neuse stormwater program. <br />N <br />Page 23 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.