Browse
Search
Agenda - 12-06-2010 - 4k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 12-06-2010 - Regular Mtg.
>
Agenda - 12-06-2010 - 4k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2010 11:29:05 AM
Creation date
12/3/2010 11:29:01 AM
Metadata
Fields
Template:
BOCC
Date
12/6/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4k
Document Relationships
2010-162 Planning - Hillsborough Stormwater Program Management & Erosion Control Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2010
Minutes 12-06-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Town of Hillsborough stormwater Management Program <br />Work Plan September 2010 <br />• Inspections <br />Inspect permitted construction sites within the Town's jurisdiction to ensure <br />compliance with approved erosion control plans. As needed, request corrective <br />actions, issue notice of violations and stop work orders as outlined in Orange <br />County's Erosion Control Ordinance. <br />5. Post-Construction stormwater Management <br />The Town's post-construction stormwater program includes four primary <br />components: new development review, stormwater BMP inspection, education and <br />outreach, and retro-fit opportunities. Legal agreements are in place allowing Orange <br />County to implement and enforce the Town of Hillsborough's post-construction <br />stormwater regulations. <br />Measurable Goals <br />• New Development Review <br />Review and approve proposed new development projects to ensure compliance <br />with the Town's stormwater post-construction requirements.. This includes <br />addressing nutrient loading since the Town is within an NSW (Neuse Basin and <br />Falls Lake Watershed). <br />• BMP Inspections <br />Inspect new structural stormwater BMPs at the time the project is complete to <br />ensure compliance with approved plans. Map new BMPs using. GPS/GIs <br />technology. Review required annual inspection reports submitted by the BMP the <br />owner. Conduct follow-up inspections as warranted and provide inspection <br />reports to owner outlining follow up actions. Issue notice of violations if <br />warranted. <br />• Education/Outreach <br />This portion. of the post-construction stormwater management program is part of <br />the overall education/outreach component described in items 1 and 2 above. <br />Primarily this includes providing information to businesses, home owner <br />associations and other stormwater BMP owners about maintenance and <br />inspection requirements. <br />• Retro-fit Opportunities <br />Identify at least one new possible stormwater retro-fit location annually. Evaluate <br />sites already identified based on land availability, willing ownership, potential for <br />pollution reductions, and other pertinent variables. Rank these sites and evaluate <br />grant availability and/or other funding sources to implement retro-fifs. Identify <br />potential partnerships to develop and fund retro-fit projects. <br />• ReQUlatorv Support <br />Provide input to the Town's Planning Department regarding regulatory <br />requirements for the Falls Lake Nutrient Management Strategy rules and the <br />17 <br />T...... 1 C ..C'17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.