Browse
Search
NS - Grant - Ratification of Application for Interoperable Communications Technology Grant
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
BOCC Grants
>
2000 - 2009
>
2005
>
2005 Grants
>
NS - Grant - Ratification of Application for Interoperable Communications Technology Grant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2011 11:30:11 AM
Creation date
11/15/2010 4:13:13 PM
Metadata
Fields
Template:
BOCC
Date
8/16/2005
Meeting Type
Regular Meeting
Document Type
Grant
Agenda Item
5o
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COPS Interoperable Communications Technology Grant Program <br />broader context of the jurisdiction's interoperability plans Such an explanation could <br />include information on the governance structure overseeing the effort; a communications <br />system plan; a deployment plan; an operations, maintenance, and training plan; andlor a <br />finanaal plan <br />The COPS Office is committed to avoiding duplication of existing networks or IT systems <br />in any initiatives funded for law enforcement informaton sharing systems which involve <br />interstate connectivity between jurisdictions Therefore, such-COPS-funded systems <br />should employ, to the extent possible, existing networks {e g., Law Enforcement Online <br />(LEO), Regional information Sharing Systems (RIBS}, Joint Regional Information <br />Exchange System (DRIES}, etc) as the communication bacic4one to achieve interstate <br />connectivity <br />Designated jurisdictions are invited to submit applications. far Interoperable <br />communications projects that include: <br />• Purchasing Interoperable communications equipment for multi-disciplinary and multi- <br />jurisdictional public safety communications projects <br />• Providing local jurisdictions with the equipment or services they need to participate on <br />larger public safety, commercial, or.other shared networks <br />• The purchase and deployment of portable gateway solutions. <br />• The purchase of technologies to upgrade or enhance the ability of law enforcement <br />systems to improve the timeliness, effectiveness, and accuracy of criminal justice <br />information exchanges <br />• Any other technology that can be demonstrated to significantly increase <br />interoperabilifywifhin the public safety commun'dy <br />Applicants may also request assistance for other technologies 'rf the application <br />demonstrates how the proposed technology wilt improve interoperability among the fire <br />service, taw enforoement and emergency medical service commun'sties <br />Because of the administrative harriers and significant project delays related to <br />environmental review under the National Environmental Policy Act {NEPA), the COPS <br />Office will not fund requests for costs that include construction under the 2f)Q5 COPS <br />Interoperable Communications Technology Program (e.g , towers, base stations or <br />buildings) Any proposed costs requiring environmental review will be deemed disallowed <br />during budget clearance by the COPS Office <br />This year, proposals will be accepted to improve both voice Interoperable communications <br />andlor data information sharing If an Interoperable communications plan has not been <br />developed, the application should also include a description of how the plan will be <br />established as part of the proposed project <br />Budget requests may tie made in the categories of: <br />• Equipment <br />• Supplies <br />• TraveUTraining <br />• Contractslconsultants [Note: any consultant or contracting charges associated with <br />your project over $4501day will require documented justification and prior written <br />approval by the COPS Office Determinations will be made on acase-by-case basis j <br />• Other costs <br />• In addition, 'stems that have a direct correlation to the overall success of a grantee's <br />project objectives and are necessary for the project to reach full implementation will <br />be considered on a case-by-case basis by the program team <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.