Browse
Search
Agenda - 11-18-2010 - 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 11-18-2010 - Work Session
>
Agenda - 11-18-2010 - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2010 9:36:18 AM
Creation date
11/15/2010 9:36:15 AM
Metadata
Fields
Template:
BOCC
Date
11/18/2010
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes 11-18-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On-going Challenges <br />The reservation process is still under construction. It is intended to be a single portal for the <br />person making a reservation. Once the reservation has entered the system, it will be routed to <br />the responsible parties for processing and approval and the reservation will then be confirmed. <br />Ideally, the requestor will be able to do most of the work electronically, which is not presently <br />accommodated in house. Staff is exploring options for bridging existing software used by <br />Recreation and Senior Centers with a more user friendly application for the public. A third <br />component is to use a software application that will allow a flat screen monitor to be used to <br />display the meetings that are to be held in the building. This will be particularly effective for the <br />meeting attendees at the West Campus Office Building where meetings could be held in seven <br />different areas of the building. The use of a flat screen to display meetings and their locations <br />was included in the design of the building. Finding compatible software to meet these three <br />needs and present a seamless process to the user is the challenge to be met. <br />Another challenge is how facilities will be secured following an after-hours meeting. In order to <br />more effectively use custodial staff, work hours were changed to an early morning shift (yam) <br />rather than evenings. Although this is more efficient for custodial work, it leaves a gap in how <br />buildings are to be secured when anon-county user holds after hours meetings. Staff is <br />exploring three possibilities to address this matter: <br />• Collaborating with Orange Enterprises or another contractor who could provide lock up <br />services; or <br />• Forming the County's own in-house team with seasonal workers; or <br />• Installing technology that would lock the building automatically at pre-designated times. <br />Any additional labor required would be factored into the fee schedule for after-hours use. <br />Fees <br />Proposed fees will be based on: <br />• Current Orange County fees, in the case of Recreation facilities; and <br />• Similar services at other locations in the area; and <br />• Total cost recovery for Category Six reservations. These will also be compared to similar <br />facilities available for rent at area hotels and university facilities. <br />Timeline <br />November 18, 2010 -Policy is presented and discussed. Board comments as desired. <br />By February 2011 -Board comments are incorporated and Policy is approved, including fee <br />classification. <br />By February 2011 -Technology decisions are made. <br />By June, 2011 -Fees are approved as part of the 2012 Budget. <br />July 1, 2011 -Facilities Use Policy becomes effective. <br />FINANCIAL IMPACT: Financial impacts will be discussed at such time fees are established. <br />RECOMMENDATION(S): The Manager recommends the Board provide comment to staff <br />regarding the contents of the Facilities Use Policy as may be appropriate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.