Browse
Search
2010-113 AMS - Morlando Construction, LLC - Construction Agreement for PFAP renovation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-113 AMS - Morlando Construction, LLC - Construction Agreement for PFAP renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2018 8:23:10 AM
Creation date
11/10/2010 3:58:08 PM
Metadata
Fields
Template:
Contract
Date
10/29/2010
Contract Starting Date
11/1/2010
Contract Ending Date
4/30/2011
Agenda Item
Manager signed
Amount
$802,470.00
Document Relationships
R 2010-113 APS - Morlando Construction
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii. If a claim is made such claim shall be made to the initial decision maker, if <br /> applicable, who may request more supporting data, reject the claim in whole or in <br /> part, approve the claim in whole or in part or advise the parties the claim is unable <br /> to be resolved. <br /> iii. If a claim is made by the Owner the Owner may, but is not obligated to, notify the <br /> surety. <br /> 9. NON—APPROPRIATION <br /> a. Contractor acknowledges that Owner is a governmental entity, and the validity of this <br /> Agreement is based upon the availability of public funding under the authority of its <br /> statutory mandate. <br /> b. In the event that public funds are unavailable and not appropriated for the performance of <br /> Owner's obligations under this Agreement, then this Agreement shall automatically expire <br /> without penalty to Owner immediately upon written notice to Contractor of the <br /> unavailability and non-appropriation of public funds. It is expressly agreed that Owner <br /> shall not activate this non-appropriation provision for its convenience or to circumvent the <br /> requirements of this Agreement, but only as an emergency fiscal measure during a <br /> substantial fiscal crisis. <br /> c. In the event of a change in the Owner's statutory authority, mandate and/or mandated <br /> functions, by state and/or federal legislative or regulatory action, which adversely affects <br /> Owner's authority to continue its obligations under this Agreement, then this Agreement <br /> shall automatically terminate without penalty to Owner upon written notice to Contractor <br /> of such limitation or change in Owner's legal authority. <br /> 10.NOTICES <br /> Any notice required by this Agreement shall be in writing and delivered by certified or registered <br /> mail, return receipt requested to the following: <br /> Owner: Contractor: <br /> Orange County Morlando Construction, LLC <br /> P.O. Box 8181 8604 Cliff Cameron Drive, Suite 155 <br /> Hillsborough,NC 27278 Charlotte,NC 28269 <br /> 11. MISCELLANEOUS <br /> a. Duties and Obligations imposed by the Contract Documents shall be in addition to any <br /> Duties and Obligations imposed by state, federal or local law, rules, regulations and <br /> ordinances. <br /> b. No act or failure to act by the Owner or Contractor shall constitute a waiver of any right or <br /> duty granted them under the Contract Documents, nor shall any act or failure to act <br /> constitute any approval except as specifically agreed in writing. <br /> c. The Work shall be tested and inspected as required by the Contract Documents and as <br /> required by law. Unless prohibited by law the costs of all such tests and inspections <br /> related to state and federal codes such as ADA, Administrative, Electrical, Plumbing, <br /> Mechanical and Building Codes shall be borne by the Contractor. The costs for material <br /> and structural testing shall be conducted by an independent third party at the expense of the <br /> Revised September 2010 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.