Browse
Search
2010-113 AMS - Morlando Construction, LLC - Construction Agreement for PFAP renovation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-113 AMS - Morlando Construction, LLC - Construction Agreement for PFAP renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2018 8:23:10 AM
Creation date
11/10/2010 3:58:08 PM
Metadata
Fields
Template:
Contract
Date
10/29/2010
Contract Starting Date
11/1/2010
Contract Ending Date
4/30/2011
Agenda Item
Manager signed
Amount
$802,470.00
Document Relationships
R 2010-113 APS - Morlando Construction
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE AMERICAN INSTITUTE OF ARCHITECTS <br /> Bond No. 872871 P <br /> A1A Document A311 <br /> Labor and Material Payment Bond <br /> THIS BOND IS ISSUED SIMULTANEOUSLY WITH PERFORMANCE BOND IN FAVOR OF THE <br /> OWNER CONDITIONED ON THE FULL AND FAITHFUL PERFORMANCE OF THE CONTRACT <br /> KNOW ALL MEN BY THESE PRESENTS:that Morlando Construction, LLC <br /> {Hero inert U name and address or legal title of Contractor) <br /> 8604 Cliff Cameron Drive, Suite 155 Charlotte, NC 28269 <br /> as Principal, hereinafter called Principal, and, Developers Surety and Indemnity Company <br /> (Hero insert bill name and address or legal We of Surety) <br /> P. O. Box 19725, Irvine, CA 92623 <br /> as Surety, hereinafter called Surety, are held and firmly mound unto Orange County <br /> (Here insed hill name and address or legal We of Owner) <br /> PO Box 8181 Hillsborough, NC 27278 <br /> as Obligee, hereinafter called Owner, for the use and benefit of claimants as hereinbelow defined, in the <br /> amount of Eight Hundred Two Thousand Four Hundred Seventy Dollars and 00/100 <br /> (Hem insert a sum equal to at least owhelt of the contrail price) Dollars($802,470.00 <br /> for the payment whereof Principal and Surety bind themselves, their heirs, executors, administrators, <br /> successors and assigns,jointly and severally,firmly by these presents. <br /> WHEREAS, <br /> Principal has by written agreement dated October 15, 2010 , entered into a contract with Owner <br /> for <br /> 44w*insert U ne ne,address and description of pmjuQ <br /> Piedmont Food and Agricultural Processing Center Renovation <br /> In accordance with Drawings and Specifications prepared by Corley, Redfoot Zack, Inc. <br /> (Hero insert full name and address or legal We of Architect) <br /> which contract is by reference made a part hereof, and is hereinafter referred to as the Contract. <br /> AIA DOCUMENT A311 • PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND • AIA <br /> FEBRUARY 1970 E0. • THE AMERIGW INSTITUTE OFARCHITECT5,1735 N.Y.AVE,N.W.,WA"40TON,D.C.20008 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.