Browse
Search
2010-113 AMS - Morlando Construction, LLC - Construction Agreement for PFAP renovation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2010
>
2010-113 AMS - Morlando Construction, LLC - Construction Agreement for PFAP renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2018 8:23:10 AM
Creation date
11/10/2010 3:58:08 PM
Metadata
Fields
Template:
Contract
Date
10/29/2010
Contract Starting Date
11/1/2010
Contract Ending Date
4/30/2011
Agenda Item
Manager signed
Amount
$802,470.00
Document Relationships
R 2010-113 APS - Morlando Construction
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
able to sureties as a defense in the jurisdiction of the suit tractor of any amounts received or to be received by <br /> shall be applicable. the Owner in settlement of insurance or other claims <br /> 10 Notice to the Surety,the Owner or the Contractor shall for damages to which the Contractor is entitled, re- <br /> be mailed or delivered to the address shown on the sig- duced by all valid and proper payments made to or on <br /> nature page. behalf of the Contractor under the Construction Con- <br /> tract. <br /> 11 When this Bond has been furnished to comply with a 12,2 Construction Contract:The agreement between <br /> statutory or other legal requirement in the location where the Owner and the Contractor identified on the sig- <br /> the construction was to be performed,any provision in this nature page, including all Contract Documents and <br /> Bond conflicting with said statutory or legal requirement changes thereto. <br /> shall be deemed deleted herefrom and provisions con- <br /> forming to such statutory or other legal requirement shall 12.3 Contractor Default: Failure of the Contractor, <br /> be deemed incorporated herein. The intent is that this which has neither been remedied nor waived,to per- <br /> Bond shall be construed as a statutory bond and not as a form or otherwise to comply with the terms of the <br /> common law bond. Construction Contract. <br /> 12 DEFINITIONS 12.4 Owner Default: Failure of the Owner,which has <br /> neither been remedied nor waived, to pay the Con- <br /> 12.1 Balance of the Contract Price:The total amount tractor as required by the Construction Contract or to <br /> payable by the Owner to the Contractor under the perform and complete or comply with the other terms <br /> Construction Contract after all proper adjustments thereof. <br /> have been made, including allowance to the Con. <br /> MODIFICATIONS TO THIS BOND ARE AS FOLLOWS: <br /> (Space is provided below for additional signatures of added parties,other than those appearing on the cover page.) <br /> CONTRACTOR AS PRINCIPAL SURETY <br /> Company: {Corporate Seal) Company: (Corporate Seal) <br /> Signature: Signature: <br /> Name and Title: Name and Title: <br /> Address: Address: <br /> AIA DOCUMENT A312•PERFORMANCE BOND AND PAYMENT BOND•DECEMBER 1984 ED.•AIA <br /> THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE.,N.W.,WASHINGTON,D.C.20006 A312.1984 3 <br /> THIRD PRINTING•MARCH 1987 <br />
The URL can be used to link to this page
Your browser does not support the video tag.