Orange County NC Website
5 <br />Mr. David Canneli <br />September 14, 2010 <br />Page -2- <br />IV. Sewer System Design Phase $88,500 <br />A. Feld surveying <br />B. Development of construction drawings <br />C. Development of construction specifications <br />D. Review plans and specifications with County and City <br />E. Permit Acquisition <br />TOTAL WATER SYSTEM ANALYSIS AND DESIGN: $ 63,000 <br />TOTAL SEWER SYSTEM ANALYSIS AND DESIGN: $129,000 <br />TOTAL PROPOSAL AMOUNT: $192,000 <br />Please Hate this fee proposal does not cover the development of a preliminary engineering <br />report or an environmental assessment. These may be added to the project scope should they <br />become necessary based on funding or regulatory requirements. Upon your review and <br />concurrence with our fee proposal, we will prepare a detailed contract for the work, ar <br />coordinate with the County to execute any standard agreement you may prefer. <br />If you have any questions or require any additional information, I am available at your <br />convenience by phone at (910) 692-5616 or by email at blester@hobbsupchurch.com. <br />Sincerely, <br />HOBBS, UPCHURCH & ASSOCIATES, P.A. <br />Bill Lester, 1r., P. . <br />