Browse
Search
Agenda - 11-04-2010 - 4l
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 11-04-2010 - Regular Mtg.
>
Agenda - 11-04-2010 - 4l
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2010 9:26:41 AM
Creation date
11/9/2010 9:26:38 AM
Metadata
Fields
Template:
BOCC
Date
11/4/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4l
Document Relationships
2010-116 Planning - Hobbs Upchurch & Associates Buckhorn Mebane EDD Water and Sewer Extension Project - 11-04-10-4l
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2010
Minutes 11-04-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />Hobbs, U~achurch & Associates, P.A. <br />Consulting Engineers <br />300 S.W. Broad Street Southern Pines, NC 28388 <br />September 14, ZOIO <br />Mr. David Cannel) <br />Orange County Department of Asset Management and Purchasing <br />131 W Margaret Lane, Suite 301 <br />Hillsborough, NC 27278 <br />RE: Buclchorn-Mebane Economic Development District-Phase II <br />Proposal for Engineering Services <br />Dear Mr. Cannefl: <br />it is with great pleasure that we provide you with this Proposal for Engineering Services for the <br />Buckhorn-Mebane Economic Development District-Phase II Water and Sewer Extension Projecrt. <br />We developed this proposal at your request based on the project scope as presented in the <br />Request for Proposals. <br />I. Water System Analysis Phase $19,000 <br />A. Analysis of existing utilities and their current demand <br />B. Analysis of future service regions and estimated demand <br />C. Hydraulic analysis of existing water <br />D. Discussion with NC DOT about I-85 crossing <br />E. Analysis of environmental concerns and funding opportunities <br />F. Review analysis phase with Orange County and Mebane <br />II. Water System Design Phase $44,000 <br />A. Field surveying <br />B. Development of construction drawings <br />C. Development of construction specifications <br />D. Review plans and specifications with County and City <br />E. Permit Acquisition <br />III. Sewer System Analysis Phase $40,500 <br />A. Analysis of existing utilities and their current flows <br />B. Analysis of future service regions and estimated flows <br />C. Hydraulic analysis of existing Gravelly Hill Pump Station <br />D. Discussion with DWQ about gravity outfall <br />E. Analysis of environmental concerns and funding opportunities <br />F. Review analysis phase with Orange County and Mebane <br />Southern Pines, NC .Telephone 910-692-5616 .Fax 910-692-7342 email: info@hobbsupchurch.com <br />Wilmington . Nags Head . Charlotte <br />
The URL can be used to link to this page
Your browser does not support the video tag.