Browse
Search
Minutes 09-14-2010
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2010
>
Minutes 09-14-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2015 1:37:12 PM
Creation date
11/8/2010 9:49:58 AM
Metadata
Fields
Template:
BOCC
Date
9/14/2010
Meeting Type
Budget Sessions
Document Type
Minutes
Document Relationships
Agenda - 09-14-2010 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2010\Agenda - 09-14-2010 - Budget Work Session
Agenda - 09-14-2010 - 1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2010\Agenda - 09-14-2010 - Budget Work Session
Agenda - 09-14-2010 - 2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2010\Agenda - 09-14-2010 - Budget Work Session
Agenda - 09-14-2010 - 3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2010\Agenda - 09-14-2010 - Budget Work Session
Agenda - 09-14-2010 - 4
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2010\Agenda - 09-14-2010 - Budget Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Director and staff have spent the last two months reviewing possible options for outreach and <br /> 2 library service opportunities to the rural communities in Orange County. Through this review <br /> 3 and conversations with Planning, staff recognizes that "rural" can apply not just to Cedar Grove <br /> 4 but to other outlying unincorporated areas and service projections could theoretically <br /> 5 encompass their unique needs as well. <br /> 6 <br /> 7 1) Develop Separate Branch Libraries to Serve Rural Communities; i.e., Cedar Grove, Efland, <br /> 8 White Cross, Caldwell, etc: There is the option to build individual "bricks and mortar" facilities. <br /> 9 The first step would be to identify current vacant locations and/ or build a new facility. In <br /> 10 addition, there would be ongoing annual operational costs associated with staffing and <br /> 11 providing a full service branch for each location. In 2009 the 23, 500 sq. feet Main Library <br /> 12 was constructed and furnished for$6.521 million. Using this cost, another new facility would <br /> 13 equate to an investment of $277.52 per square foot. This figure does not include the annual <br /> 14 personnel / operational costs for Main which are currently $1,260,820. <br /> 15 <br /> 16 The 2004 Library Services Task Force Report recommended new facilities plan through 2024. <br /> 17 The plan identified the following locations and staff has provided updated construction costs. <br /> 18 <br /> 19 • Central Orange— recommended 65,000 sf (actual 23,500 sf& <br /> 20 $6.521) <br /> 21 • Regional Branch in Carrboro— 25,000 sf estimated$6.938 million <br /> 22 • Efland Cheeks Township— 10,000 sf estimated$2.775 million <br /> 23 • Cedar Grove Branch to be monitored and expand to 7,000 sf estimated$1,942 million <br /> 24 <br /> 25 To operate another full service branch of 20 —23,000 sf, exclusive of central administrative <br /> 26 and technical services, would require annual support of $964,000. The Cedar Grove Branch, <br /> 27 which was 1,200 sf, required annual personnel, operational and facilities support of $245,000. <br /> 28 <br /> 29 It should also be noted that the 23,000 sq. ft. Mebane Library, located 11.5 miles from <br /> 30 Hillsborough was constructed and opened in 2006. This library serves the Mebane area and a <br /> 31 portion of the Efland Cheeks Township. <br /> 32 <br /> 33 2) Purchase and Deploy Bookmobiles to Serve Rural Areas: Rural communities are regularly <br /> 34 served by bookmobiles that include several public Internet stations. These types of units <br /> 35 require an initial investment of at least $285,000 and annual personnel / operational support of <br /> 36 $105,000. The unit would be deployed on a weekly schedule to stop and stay a certain <br /> 37 number of hours at a specific location each week, allowing for consistency and continuity. <br /> 38 Technologies will always an issue when working within rural Orange County, as most current <br /> 39 types of equipment needed to support internet access on these mobile units requires a strong <br /> 40 signal, similar to a cell phone. <br /> 41 <br /> 42 3) Purchase and Deploy Library Service Kiosks: The Library Director and staff also evaluated <br /> 43 the Kiosk model of delivering library service and two models are listed within the report. <br /> 44 Preliminary evaluations of these two systems suggested that kiosks are more suited to urban <br /> 45 areas with high traffic locations such as malls and subways. <br /> 46 <br /> 47 4) Strenqthen Collaboration and Reciprocal Relationships with Neiqhborinq Town and County <br /> 48 Libraries: The Library Director would also like to further explore our relationship with the <br /> 49 libraries in Durham and Alamance, particularly Mebane. Currently, the Alamance County <br />
The URL can be used to link to this page
Your browser does not support the video tag.