Browse
Search
Agenda - 11-04-2010 - 4k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2010
>
Agenda - 11-04-2010 - Regular Mtg.
>
Agenda - 11-04-2010 - 4k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2010 12:27:54 PM
Creation date
10/29/2010 12:27:53 PM
Metadata
Fields
Template:
BOCC
Date
11/4/2010
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4k
Document Relationships
Minutes 11-04-2010
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2010
ORD-2010-091 Budget Amendment 3-A for Energy Efficient Lighting Installation in Triangle Sportsplex
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A: Energy Efficient Lighting, Orange County Sportsplex <br />Grant Amount: <br />$ 48,000.00 <br />Grant EII able <br />Descri tlon Total Grant Relmb.' Coun Match <br />Low E Llghting Bid: Harris Brothers Electric Ice rink T-5 lighting to $ 30,171.00 $ 15,085.50 $ 15,085.50 <br />replace metal halide <br />fixtures <br />Contingency Funds $ 1,500.00 $ 1,500.00 <br />Totals $ 30,171.00 S 16,585.50 S 16,585.50 <br />Total Funds Required from Orange County: $ 29 346.50 <br />Notes: <br />Non Grant EII Iblle <br />Descri lion Amount Grant Reimb. Count Match <br />Pool area T-5 lighting $12,761.00 $ - $ 12,761.00 <br />to replace metal halide <br />fixtures2 <br />$12,761.00 $ - $ 12 761.00 <br />1.50% match criteria <br />2. Pool area grant reimbursement was d!s-allowed in pool recreation projects after the award. <br />3. Projected total cost of project. Bid solicitations wilt be advertised this month. <br />4, $48,000 awarded less grant funds projected at 50 % of cost. Actual availability will be determined after responsive low-emissivity ceiling bid is identified. <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.