Browse
Search
2005 S Arts - SARAH CRAIGE -Agreement for Southern Human Services Center Public Art Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2005
>
2005 S Arts - SARAH CRAIGE -Agreement for Southern Human Services Center Public Art Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 2:57:57 PM
Creation date
10/27/2010 3:15:35 PM
Metadata
Fields
Template:
BOCC
Date
6/23/2005
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
5q
Document Relationships
Agenda - 06-23-2005-5q
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2005\Agenda - 06-23-2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ll'~6~aods <br />'~5~. <br />NORTH CAROLINA <br />ORANGE COUNTY <br />AGREEMENT FOR COMMISSION OF PUBLIC ART WORK <br />THIS AGREEMENT, made and entered by and between ORANGE COUNTY (the "County") <br />and SARAH CRAIGE (the "Artist") residing at 4100 Red Tail Run, Efland, NC 27243, <br />(collectively the "Parties"). <br />WITNESSETH <br />WHEREAS, on April 26, 2005, a Public Art Selection Committee (the "Committee") was <br />convened by the Orange County Arts Commission (the "Commission"), and <br />WHEREAS, the Committee proposed to select Sarah Craige to design, fabricate, deliver, and <br />install a the mural at the Southern Human Services Center, 2501 Homestead Road, Chapel Hill, <br />NC (the "Site"), and <br />WHEREAS, on May 9, 2005 the Commission approved of the recommendation of Sarah <br />Craige's design proposal for public art at the Site, and <br />WHEREAS, on June 7, 2005, after a review of public comments and following the <br />recommendation of the Commission, the Board of County Commissioners approved of Sarah <br />Craige's design proposal (the "General Design Concept"), <br />NOW, THEREFORE, based upon the mutual promises contained herein and other valid and <br />sufficient consideration, the parties agree as follows: <br />ARTICLE 1. DESIGN DEVELOPMENT <br />a. Artist will have a maximum of (60) days after execution of this Agreement to refine <br />and add details to the General Design Concept in collaboration with the Parties and <br />input from the citizens of the Site community, and complete a fully developed design <br />proposal, which shall consist of a project budget, scaled drawings, a written statement <br />describing the concept for the public art, material samples, samples of coatings and <br />finishes, a tentative fabrication and delivery schedule, steps for installing the work at <br />the Site, and maintenance recommendations (the "Fully Developed Design <br />Proposal"). The fabrication and delivery schedule shall provide for progress reports at <br />50%, and 100% completion of fabrication, include photographs and other images of <br />the public art, and require delivery to, and installation of the public art at, the Site <br />before the end of June, 2006. <br />b. The Commission shall schedule a review of the Fully Developed Design Proposal by <br />the Committee. The Artist shall attend this review. At this meeting, the Committee <br />may either accept the Fully Developed Design Proposal, at which point it will be <br />presented to the Commission and the County for approval, or request that the Artist <br />develop a second proposal within a reasonable timeframe, not exceeding thirty (30) <br />days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.