Orange County NC Website
For each quarter ending March 31, June 30, September 30, and December 31, Contractor <br />shall submit verifiable copies of fuel invoices. The Actual Per Gallon Fuel Cost of diesel <br />fuel as paid by Contractor shall be determined by computing a straight line average from the <br />invoices for the quarter in question (total: cost of diesel fuel /total gallons of fuel purchased), <br />and as calculated must be agreed upon by County and Contractor. If and only if the Actual <br />Per Gallon Fuel Cost for any quarter is either more than one hundred ten percent (110%) or <br />less than ninety percent (90%) of the Base Line Fuel Cost for that year, then a Fuel Cost <br />Adjustment shall be made. If the Actual Per Gallon Fuel Cost is neither less than 90% nor <br />more than 110% of the Base Line Fuel Cost, then no Fuel Cost Adjustment shall be made for <br />that quarter. <br />Fuel Cost Adjustments shall be made as follows: <br />If the Actual Per Gallon Fuel Cost is less than. 90% of the Base Line Fuel Cost, the difference <br />between the Base Line Fuel Cost and the Actual Per Gallon Fuel Cost shall be multiplied by <br />the Base Line .Fuel Usage and then multiplied by three (3) months. The resultant dollar <br />amount shall be considered the Fuel Cost Adjustment and shown as an itemized credit on the <br />invoice for service and shall be deducted by County when it pays the invoice. <br />If the Actual Per Gallon Fuel Cost is more than 110% of the Base Line Fuel Cost, the <br />difference between the Base Line Fuel Cost and the Actual Per Gallon Fuel Cost shall be <br />multiplied by the Base Line Fuel Usage and then multiplied by three (3) months. The <br />resultant dollar amount. shall be considered the Fuel Cost Adjustment and shown as an <br />itemized additional charge on the invoice for service, and shall be paid by County as <br />stipulated in .Section 16, Compensation for Services. <br />SECTION 5 <br />Scope of Services <br />County's Request for Statements of Qualification (RFQ); and Request For Proposal (RFP) <br />number 5112, and any associated Addendum, as well as Contractor's Statement of Qualification <br />and Proposal dated April 14, 2005, are incorporated herein by reference. Any conflict between <br />the terms of .this Contract and the terms of any of the RFQ, the RFP or the April 14, 2005 <br />Proposal will be governed by the terms of this Contract. <br />Contractor shall perform Recycling Collection Services as follows: <br />Contractor shall collect and remove for marketing or reuse all properly prepared Recyclable <br />Materials which are placed in or adjacent to approved Recycling Bins at the curb, roadside (in the <br />case when there is no curb), or other agreed upon location in the case of Handicap /Disabled <br />collection (for further details about proper preparation of Recyclable Materials, see Section 13 of <br />this Contract). <br />Contractor may use whatever collection style deemed beneficial when collecting Recyclable <br />Materials to the extent that newspaper, magazines, and telephone books must be sorted from the <br />Containers at. the curb, and must be transported to the processor in a separate compartment of the <br />collection vehicle. Contractor may not utilize "Single-Stream" style collection. <br />6 <br />