Browse
Search
2005 S Solid Waste - Waste Industries, LLC. of Durham RFP Award: Urban Curbside Recycling Services Contract
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2005
>
2005 S Solid Waste - Waste Industries, LLC. of Durham RFP Award: Urban Curbside Recycling Services Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 2:53:42 PM
Creation date
10/26/2010 4:10:13 PM
Metadata
Fields
Template:
BOCC
Date
6/23/2005
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
5f
Document Relationships
2009-013 Solid Waste - Waste Industries LLC of Durham- Addendum to Agreement dated 10-1-2005 for Urban Curbside Recyclable Materials Collection Services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Agenda - 06-23-2005-5f
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2005\Agenda - 06-23-2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iv. A discussion of any public awareness activities and their impact on participation and <br />recovered volumes; and <br />v. A discussion of highlights and problems and measures taken to resolve problems and <br />increase efficiency and household participation. <br />f) Contractor shall, upon signature of this Contract, provide a copy of its incentive plan to increase <br />collector productivity so there is proof of the Contractor's intent to improve collection efficiency <br />to lower collection costs. <br />SECTION 28 <br />Force Maieure <br />Contractor's performance hereunder may be suspended and its obligations hereunder excused in the <br />event and during the period that such performance is prevented by a cause or causes beyond the <br />reasonable control of Contractor unless such cause or causes are the sole result of action or <br />nonaction by Contractor. Such causes shall include, but not be limited to, acts of God, acts of war, <br />riot, fire, explosion, accident, flood or sabotage; lack of adequate fuel, power or raw materials, <br />judicial administrative or governmental laws, regulations, requirements, rules, orders or actions; <br />injunctions or restraining orders; the failure of any governmental body to issue or grant, or the <br />suspension or revocation or'modification of any license, permit or other authorization necessary for <br />the construction and/or operation envisioned by this Contract; national defense. requirements; labor <br />strikes, lockout or injunction. <br />SECTION 29 <br />Waiver <br />A waiver of any breach of any provision of this Contract shall not constitute or operate as a waiver <br />of any breach of such provision. or of any other provisions, nor shall any failure to enforce any <br />provision hereof operate as a waiver of such provision or of any other provision. <br />SECTION 30 <br />Law to Govern <br />County is a political subdivision of the State of North Carolina. Contractor is a North Carolina <br />Limited Liability Company. This Contract is entered into and is to be performed entirely within the <br />State of North Carolina. County and Contractor agree that the law of the State of North Carolina <br />shall govern the rights, obligations, duties and liabilities of the parties to this Contract and shall <br />govern the interpretation of this Contract. <br />SECTION 31 <br />Titles of Sections <br />Section headings inserted herein are for convenience only, and are not intended to be used as aids to <br />interpretation and are not binding on the parties. <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.