Browse
Search
2005 S Solid Waste - Olver IncorporatedEngineering Services for Landfill Renewed June 2008
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2005
>
2005 S Solid Waste - Olver IncorporatedEngineering Services for Landfill Renewed June 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 2:49:46 PM
Creation date
10/26/2010 3:59:12 PM
Metadata
Fields
Template:
BOCC
Date
6/23/2005
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
5e
Document Relationships
Agenda - 06-23-2005-5e
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2005\Agenda - 06-23-2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4` ' <br />-s~e`v~ ~ d 8' ~ e„ <br />STATE OF NORTH CAROLINA AGREEMENT FOR ENGINEERING <br />THE COUNTY OF ORANGE SERVICES <br />This Agreement made and entered into by and between the County of Orange, on behalf of its <br />Solid Waste Department, herein referred to as "County" and Olver Incorporated herein <br />referred to as "Engineer" for Professional Engineering Services to support ongoing and <br />recurring engineering and environmental consulting services beyond the limited capability of <br />the Solid Waste Department. <br />I. WITNESSETH <br />That for and in consideration of the mutual promises and conditions set forth below, the <br />County and Engineer agree as follow: <br />1. This contract shall be in effect from July 1, 2005 to June 30, 2008. <br />2. Duties of Engineer: The Engineer agrees to provide as requested: <br />a} Preparation of presentation material for public meeting including AutoCAD <br />drawings, poster boards, renderings, etc. <br />b) Attendance at meetings <br />c) Preparation of designs and bid documents for department projects <br />d) Assistance in preparing scope of work requests for proposals <br />e} Assistance with review of bid documents and proposals <br />f) Preparation of drawings, calculations, evaluations, estimates, assessments, etc. <br />g) Review technical proposals <br />h) Waste characterizations <br />i) Master plan drawing preparation <br />j) Capacity calculations <br />k) Feasibility studies <br />1) Drainage%rosion control plans <br />m) Other technical assistance as maybe necessary <br />3. Duties of County: The County shall provide direction to the Engineer as to the specific <br />services required and the schedule of delivery for tasks. The Engineer shall submit a <br />written scope of work and estimated budget for approval prior to commencing work. <br />4. Subcontractors: The Engineer shall obtain County approval before using any <br />subcontractors or sub consultants <br />4. Billing and Payment: The Engineer shall submit regular invoices, using Standard Billing <br />Rates (Attachment A), for work performed and shall be paid for completion of the work <br />performed during that period under the terms of this Agreement. The County shall make <br />payment within thirty (30} days of receipt of an accurate invoice. <br />5. Insurance: The Engineer shall procure and maintain insurance for protection from claims <br />under worker's compensation acts, claims for damages because of bodily injury including <br />personnel injury, sickness or disease or death of any and all employees or of any person <br />
The URL can be used to link to this page
Your browser does not support the video tag.