Browse
Search
2005 S Solid Waste - Judy D Brooks for Contract Renewal for Food and Organic Waste Collection and Composting
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2005
>
2005 S Solid Waste - Judy D Brooks for Contract Renewal for Food and Organic Waste Collection and Composting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2016 10:55:41 AM
Creation date
10/25/2010 9:35:13 AM
Metadata
Fields
Template:
BOCC
Date
6/7/2005
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5l
Tags
Permanent Retention
Document Relationships
2010-043 Solid Waste - Judy D. Brooks Contractor, Inc. - Addendum to Agreement for collection and composting of food and organic waste
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2010
Agenda - 06-07-2005-5l
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2005\Agenda - 06-07-2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 7 <br />Contractor shall transport the collected materials to its Processing Center. Contractor shall take title and <br />have access to the collected materials upon placement in the collection container by participating Generators <br />in accordance with Section 3. Contractor shall be responsible for processing collected materials and shall <br />retain all of the benefits from use of this material. <br />SECTION 8 <br />Contractor shall, at its sole cost and expense, except as otherwise provided herein, furnish all labor and <br />equipment required to perform collection of separated food waste and other compostable organic materials <br />pursuant to this Agreement. <br />SECTION 9 <br />In case of a missed pick-up reported by the County or a Generator, Contractor shall collect from the missed <br />collection location within 24 hours or the next working day following notification if the Food Waste and <br />other Compostables were properly prepared and accessible at regularly scheduled collection time. All calls <br />relating to missed pick-ups shall be logged by Contractor and reported to County with the monthly invoice. <br />The log book shall be available for inspection by the County. <br />SECTION 10 <br />Contractor may refuse to collect if a Generator does not properly separate Food Waste materials, or if the <br />Food Waste Collection Containers are inaccessible. At the time of refusal to make the pick-up, Contractor <br />will issue, at its expense, a written notice to the Generator that contains instructions for the proper <br />preparation and separation of Food Waste materials. The County must receive written, faxed, email, or <br />verbal notification of this refusal within 24 hours of issuance to the generator. If the Contractor misses or <br />refuses to collect properly sorted and prepared materials from agreed to collection sites without the above <br />justification, the Contractor is subject to a fine of $25 per refused site per scheduled collection. The charge <br />maybe deducted from the monthly bill. <br />If a Generator receives two such successive notices within a period of 30 days, Contractor, after obtaining <br />consent from the County, may refuse all further collections from that Generator upon notice to the Generator <br />and the County. Any replacement location shall be agreed upon jointly by Contractor and the County. <br />SECTION 11 <br />Contractor may maintain a Processing Center for composting separated Food Wastes at its facility located in <br />Chatham County or at another properly permitted facility of its choice. All Food Waste and Compostable <br />Organic Waste materials collected from Generators will be processed into compost at the Processing Center. <br />Title to collected materials brought to the Processing Center shall be with Contractor and Contractor shall <br />have the responsibility for the proper processing and use of such collected materials. Storage of Food Waste <br />
The URL can be used to link to this page
Your browser does not support the video tag.