Browse
Search
ORD-2005-024 - Orange County Flood Damage Prevention Ordinance Amendments
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2000-2009
>
2005
>
ORD-2005-024 - Orange County Flood Damage Prevention Ordinance Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 11:59:57 AM
Creation date
10/22/2010 3:21:41 PM
Metadata
Fields
Template:
BOCC
Date
5/23/2005
Meeting Type
Public Hearing
Document Type
Ordinance
Agenda Item
C.1
Document Relationships
Agenda - 05-23-2005-c1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2005\Agenda - 05-23-2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
43 <br />d. Appeal. Any owner who has received an order to take corrective action <br />may appeal the order to the Board of Adjustment by giving notice of <br />appeal in writing to the Floodplain Administrator and the clerk within ten <br />(10) days following issuance of the final order. In the absence of an <br />appeal, the order of the Floodplain Administrator shall be final. The Board <br />of Adjustment shall hear an appeal within a reasonable time and may <br />affirm, modify and affirm, or revoke the order. <br />e. Failure to Comply with Order. If the owner of a building or property fails to <br />comply with an order to take corrective action from which there was no <br />appeal or fails to comply with a Board of Adjustment order following an <br />appeal, the owner shall be guilty of a Class 3 misdemeanor and shall be <br />punished in the discretion of the court of competent jurisdiction. <br />General Standards <br />In all Special Flood Hazard Areas the following provisions are required. Any <br />alteration, repair, reconstruction, or improvements to a structure shall meet the <br />requirements of "new construction." Permit holders or their contractors shall: <br />1. Anchor all new construction and substantial improvements to prevent <br />flotation, collapse, or lateral movement of the structure. <br />2. Construct all new construction and substantial improvements with <br />materials and utility equipment resistant to flood damage. <br />3. Construct all new construction or substantial improvements using methods <br />and practices that minimize flood damages. <br />4. Design and locate electrical, heating, ventilation, plumbing, air <br />conditioning equipment, and other service facilities to prevent water from <br />entering or accumulating within the components during conditions of <br />flooding. These include, but are not limited to HVAC equipment, water <br />softener units, bath /kitchen fixtures, ductwork, electric meter <br />panels /boxes, utility /cable boxes, appliances (washers, dryers, <br />refrigerator, etc.), hot water heaters, and electric outlets /switches. <br />5. Design all new and replacement water supply systems to minimize or <br />eliminate infiltration of floodwaters into the system. <br />6. Design new and replacement sanitary sewage systems to minimize or <br />eliminate infiltration of floodwaters into the systems and discharges from <br />the systems into floodwaters. <br />r(f::i: "ii:•' 'pit`:. >;;• ?L'3t;L•s1'tii�i- 3`. -ii Cc:::;lirs:':.s': <br />
The URL can be used to link to this page
Your browser does not support the video tag.