Orange County NC Website
05/12/2005 <br />17 <br />a djaeeiA gfad-e.. Provosed elevation, and method thereof, of all development within a <br />411A including but not limited to: <br />i. Elevation in relation to mean sea level of the proposed reference level (including <br />basement) of all structures; <br />ii. Elevation in relation to mean sea level to which any non-residential structure in <br />Zone AE, A, or AO will be flood-proofed; <br />iii. Elevation in relation to mean sea level to which any proposed utility systems will <br />be elevated or flood proofed; <br />eated as a r- ---'+ <br />e. Wher-e aiay water-eewse --- :11 be `+eFe4-eF-Fe1O 4' 0— — Pm-'uF` ­"epment, <br />the appheatien F development pem3it sb.41 inelude a desIn!-:-*4-- ef the ex4e'# eE <br />watefeeufse wheffafien er- --l—afien- A en the effeets -__1 dhe Pr-epesedd <br />pr-ejeet en the flood e eity of +-,-.w ­�._ <br />BHA - —OP 6howing the leeatien ef the pr-epe <br />leeaW both upstr-eam and-dewa&tr-eam; <br />water-eeur-se alter-atien er r-eleeatien. <br />9- <br />When a st-,�e is Reed pr-eefed, the wlieaflt shall-Tr-e-Ade a ­+Lana4e frzeffi -a <br />registered pr-efessional : ar-el-Ateet If flood iproormg, a flood proofing <br />certificate and back-up plans from a registered professional engineer or architect <br />certifying that the non-residential flood proofed development will meet the flood- <br />proofing criteria in Section 42-(2) and 42 -94 -5.2 <br />eempieteEk. WiffHE -H: MUMMM tMY- <br />flood pr-eefing by whatever- eenstfuetien means, v4iiehe applieable, <br />duty of the pemait helder- te sub 4e the leeal administFater- a eer-tifieafieii e <br />elev6tien of the lewest fleer, er- Reed pr-eefed elevatien, , as <br />in relation to mean sea level. This eer-tifie-afien shall be prepared by er- under- the dir-eet <br />of a NeAh Carolina heensed pr-efessienal land sur-veyer- or- pr-efessienal <br />eaggineef md ee--4e A J- the surw" ff. When geed pr-eefing is u4lized for- <br />pai4ieular- building, eefffifinatien shall be prepared by er- undef the dir-ee H)f-a <br />pEefession-al. en&eer- er- arehiteet and eer-tified by the en-i -,-biteet. Aay we-A. <br />dene v4tbin the 21 .l and pfier- te sub- mice ien ef,the cerfifieatie-fi shall be --+. the <br />peffnit helder-'s risk. The lereal adm- --wistFater- shall r-eview the fleer- elevatien survey dat <br />subn3ifted. The pen:ait e—diately and pr-ier- te fiffffier- pr-e- k bein <br />pefF.Hitted te pr-eeeed shall eerFeet defieieneies deteeted by sueh review. 1761 liwire te S13 wAt. <br />the survey er. failufe to make the eeffeefie s fe-qui-r-ed by this subseetien sW1 be eau <br />issue a stelp PI-Jeet- A Foundation Plan drawn to scale, which shall <br />include details of the proposed foundation system to ensure all provisions of this <br />Ordinance are met. These details include but are not limited to: <br />i. Proposed method of elevation, if applicable (i.e., fill, solid foundation perimeter <br />wall, solid backfilled foundation, open foundation on <br />columns /posts /piers /piles /shear wall); <br />2", <br />