Browse
Search
2005 S Solid Waste - Phillip Post & Associates Engineering Services to Design Landfill Sewer Connection
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2005
>
2005 S Solid Waste - Phillip Post & Associates Engineering Services to Design Landfill Sewer Connection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 2:17:04 PM
Creation date
10/18/2010 12:50:35 PM
Metadata
Fields
Template:
BOCC
Date
5/17/2005
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9b
Document Relationships
Agenda - 05-17-2005-9b
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2005\Agenda - 05-17-2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Prepare detailed plats for obtaining easements, encroachment agreements, Right-of--Ways for the <br />construction of the sewer system. <br />5. Other design services necessary for the construction of the sewer system. <br />B. PERMITTING PHASE: <br />1. Obtain erosion control permits for land distributing operations from the State and or local <br />regulatory agency with the County. <br />2. Obtain highway encroachment agreements from N.C. Department of Transportation (DOT). <br />3. Obtain zoning compliance permit from Chapel Hill. <br />4. Obtain sewer system permits from OWASA and NC Department of Water Quality (DWQ). <br />5. Obtain encroachment permit from Norfolk Southern Railroad <br />6. Obtain any other permit or agreement necessary for the construction of the sewer system. <br />C. BIDDING AND NEGOTIATING PHASE: <br />1. Distribute plans and specifications to prospective bidders for pricing, following all applicable laws <br />that govern the formal bid process for construction contracts involved with public monies. <br />2. Conduct aPre-Bid Conference at a time and place selected by the County. <br />3. Prepare Bid Tabulations and Certification of Bid results for the County. <br />4. Recommendation of award of low, responsible, responsive bidder to the County. <br />5. Assist County with preparing a Contract with selected contractor. <br />6. Conduct any other bidding or negotiation process necessary for the construction of the sewer <br />system. <br />D. CONSTRUCTION OBSERVATION / AS-BUILT DRAWING PHASE <br />1. Conduct aPre-Construction Conference with the selected contractor at a time and place selected by <br />the County. <br />2. Make site visits, attend project meetings, provide clarification of drawings while construction is in <br />progress, assist the Contractor in interpreting the contract documents and observe that the <br />Contractor conforms during construction with the intent of the plans and specifications. Inform the <br />County of any discrepancies and additional costs during construction. <br />3. Review project submittals, shop drawings for conformance to plans and specifications and change <br />order requests for additional work. <br />4. Review contractor's application for payments to the County. <br />5. Perform substantial completion and final completion inspections. Oversee the preparation of "punch <br />list "items to complete the Project. <br />6. Provide final certification of the sanitary sewer system utility construction as required by law. <br />7. Provide "As-Built Drawings" as required by the County and the State of North Carolina. <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.